State |
Location |
|
Project# |
Agency |
Description |
Bid Date |
CA |
Dunsmuir |
|
|
Dunsmuir Elementary School District
|
Dunsmuir Elementary School Covered Walkways and HVAC
|
1-16-2024 |
CA |
Fresno |
|
|
|
Planting, maintaining existing planting area, and recycled water. |
1-17-2024 |
CA |
Fresno |
|
|
|
Planting, maintaining existing planting area, and recycled water. |
1-17-2024 |
CA |
Los Angeles County |
|
|
Caltrans |
Upgrade tunnel lighting systems and installation of vehicle stations. |
1-17-2024 |
CA |
|
|
17-07 |
|
Spring Lake Recycled Water Project
|
1-18-2024 |
CA |
|
|
17-07 |
|
Spring Lake Recycled Water Project
|
1-18-2024 |
CA |
Los Angeles County |
|
|
Caltrans |
Cameras systems |
1-18-2024 |
CA |
San Diego |
|
11-411904 |
|
Construct rock blanket, fence, striping, landscape, and electrical.
|
1-18-2024 |
CA |
Fresno County |
|
|
|
HMA (Type A), HMA-OGFC, CL2 aggregate base and roadway excavation. |
1-18-2024 |
CA |
Fresno County |
|
|
|
2020 CMAQ Alley Paving Project |
1-18-2024 |
CA |
Los Angeles County |
|
|
Caltrans |
Install new transportation management system elements
|
1-18-2024 |
CA |
Los Angeles County And Ventura County |
|
|
Caltrans |
|
1-18-2024 |
CA |
Los Angeles County |
|
|
Caltrans |
Install new transportation management system elements
|
1-18-2024 |
CA |
Baldwin Park |
|
|
City of Baldwin Park |
Pacific Avenue and Bogart Avenue Traffic Signalization
|
1-23-2024 |
CA |
LOS ANGELES COUNTY AND VENTURA COUNTY |
|
|
Caltrans |
Camera’s systems |
1-18-2024 |
CA |
Mono County |
|
|
|
Hot mix asphalt (type A), rail element wall, and roadway excavation. |
1-24-2024 |
CA |
Rocklin |
|
|
Rocklin Unified School District
|
Quarry Trail Elementary School-Portable Classroom Building Expansion
|
1-24-2024 |
CA |
San Diego |
|
|
|
Storm Water Infrastructure Improvements at B Street Pier
|
1-25-2024 |
CA |
San Diego |
|
|
|
Storm Water Infrastructure Improvements at B Street Pier
|
1-25-2024 |
CA |
Kern County |
|
|
|
Cold plane with hot mix asphalt and rubberized hot mix asphalt.
|
1-25-2024 |
CA |
Chico |
|
|
|
Esplanade Corridor Safety and Accessibility Project
|
1-25-2024 |
CA |
San Diego |
|
|
|
Bradley Ave. Widening Project |
1-25-2024 |
CA |
San Luis Obispo County |
|
05-03307A4 |
|
Trucking Services to Haul Aggregate Base & HMA Base
SLO 46 - Cholame Segment
|
1-26-2024 |
CA |
San Luis Obispo County |
|
05-03307C4 |
|
Trucking Services to Haul Aggregate Base & HMA Base
SLO 46 – Wye Segment
|
1-26-2024 |
CA |
|
|
B-01-23-24 |
EAST SIDE UNION HIGH SCHOOL DISTRICT
|
|
1-27-2024 |
CA |
Santa Margarita |
|
300439 |
County of San Luis Obispo
|
El Camino Real Bridge Over Santa Margarita Creek
|
1-29 -2024 |
CA |
Santa Margarita |
|
300439 |
County of San Luis Obispo
|
El Camino Real Bridge Over Santa Margarita Creek
|
1-29 -2024 |
CA |
Kern County |
|
|
|
Cold plane with hot mix asphalt and rubberized hot mix asphalt.
|
1-30-2024 |
CA |
RIVERSIDE COUNTY |
|
|
|
Hot mix asphalt, soil nail, structural concrete and roadway Exc. |
1-31-2024 |
CA |
Temecula |
|
08-1G6704 |
|
Hot mix asphalt, soil nail, structural concrete and roadway Exc
|
1-31-2024 |
CA |
Temecula |
|
|
|
79 Pauba to Sage |
1-31-2024 |
CA |
|
|
C51646 |
|
East & West Elevators Replacement
|
1-31-2024 |
CA |
Riverside County |
|
|
Caltrans |
Construction on State Highway in Riverside County Near Temecula from 0.4 Mile South of Sage Road to 1.1 Miles South of Pauba Road. |
1-31-2024 |
CA |
Riverside County |
|
08-1G6704 |
|
Hot mix asphalt, soil nail, structural concrete and roadway Exc..
|
1-31-2024 |
CA |
Los Angeles County |
|
|
Caltrans |
Construct GSRDs, MVPs, and biowales. |
1-31-2024 |
CA |
Tulare County |
|
|
|
Cold plane AC pavement and place HMA. |
1-31-2024 |
CA |
Orange County |
Zusser Company Inc. |
|
County of Orange Public Works
|
OC Loop Carbon Creek Channel Segment D Bikeway Gap Closure |
1-31-2024 |
CA |
Orange County |
|
|
County of Orange Public Works
|
OC Loop Carbon Creek Channel Segment D Bikeway Gap Closure |
1-31-2024 |
CA |
Los Angeles |
|
07-347904 |
|
Cold plane, place HMA, RHMA, JPCP, ISR, & replace bridge slabs.
|
2-1-2024 |
CA |
Los Angeles |
|
07-347904 |
|
Cold plane, place HMA, RHMA, JPCP, ISR, & replace bridge slabs.
|
2-1-2024 |
CA |
Santa Barbara County |
|
012124 |
|
Cold Springs Debris Basin Improvement Project
|
2-1 -2024 |
CA |
SAN BERNARDINO COUNTY |
|
|
|
Building work, HMA, and temporary portable sanitary facilities. |
2-1-2024 |
CA |
SAN BERNARDINO COUNTY |
|
08-1K4904 |
|
Building work, HMA, and temporary portable sanitary facilities.
|
2-1-2024 |
CA |
Los Angeles County |
|
|
Caltrans |
Upgrade and install new transportation management system elements |
2-1-2024 |
CA |
Santa Barbara County |
|
05-1C9504 |
|
Cold plane AC Pvmt, RHMA, lighting systems, and replace bridges.
|
2-1 -2024 |
CA |
Santa Barbara County |
|
05-1C9504 |
|
Cold plane AC Pvmt, RHMA, lighting systems, and replace bridges.
|
2-1 -2024 |
CA |
|
|
10-1C2704 |
|
Replace safety roadside rest area.
|
2-1-2024 |
CA |
|
|
06-0X7804 |
|
Construct slope paving (stamped concrete) and rock blanket
|
2-1-2024 |
CA |
San Luis Obispo County |
|
05-03307A4 |
|
Trucking Services to Haul Aggregate Base & HMA Base
SLO 46 - Cholame Segment
|
2-2-2024 |
CA |
Novato |
|
CIP 09-003 |
|
Grant Avenue Bridge Rehabilitation
|
2-6 -2024 |
CA |
Novato |
|
CIP 09-003 |
|
Grant Avenue Bridge Rehabilitation
|
2-6 -2024 |
CA |
|
|
C215078 |
Jurupa Community Services District
|
Recycled Water Pump Station Project
|
2-6-2024 |
CA |
Bakersfield |
|
|
Panama-Buena Vista Union School District
|
New K-8th Grade School – Off-Site Improvements |
2-6-2024 |
CA |
Temecula |
|
D2008 |
Rancho California Water District
|
Equipping New Well No. 172
|
2-6-2024 |
CA |
San Diego |
|
|
|
Bradley Ave. Widening Project |
2-6-2024 |
CA |
|
|
C51646 |
|
East & West Elevators Replacement
|
2-7-2024 |
CA |
|
|
01-0H1704 |
|
Cold plane AC pavement and place HMA-A, RHMA-G, and HFST
|
2-7-2024 |
CA |
|
|
01-0H1704 |
|
Cold plane AC pavement and place HMA-A, RHMA-G, and HFST
|
2-7-2024 |
CA |
Amador |
|
|
|
Carbondale Road Bridge Replacement |
2-8-2024 |
CA |
Fresno County |
|
|
|
Cold plane AC pavement, RHMA-G (BWC) and HMA (Type A). |
2-8-2024 |
CA |
San Diego |
|
FY19-20 |
|
Pedestrian Gap Improvements Projects (Sunset Road)
|
2-8-2024 |
CA |
SAN BERNARDINO COUNTY |
|
|
Caltrans |
Install CMS system, furnish sign structure, and sign foundation on Rte. 40,58,62, & 95 |
2-8-2024 |
CA |
National City |
|
|
|
Pavement Improvements at National City |
2-8-2024 |
CA |
Lodi |
|
|
Lodi Unified School District
|
Millswood Middle School Portable Relocation
|
2-8-2024 |
CA |
Lodi |
|
|
Lodi Unified School District
|
JAESC Portable Relocation
|
2-8-2024 |
CA |
Los Angeles County |
|
|
City of Los Angeles |
Highway Safety Improvement Program (HSIP)-Cycle 7: 9 Left Turn Signal Modifications and Highway Safety Improvement Program (HSIP) Cycle 7: 23 RRFB & 1 HAWK Citywide
|
2-12-2024 |
CA |
Santa Barbara And San Luis Obispo Counties |
|
|
|
Cold plane AC pavement and overlay with RHMA-G. |
2-13-2024 |
AZ |
Phoenix |
|
2024-016-RFQ |
Phoenix – Mesa Gateway Airport Authority
|
Runway 12R-3L Reconstruction
|
2-13-2024 |
CA |
|
|
017924 |
Monterey Peninsula Unified School District
|
Monterey High School Multi-Use Lower Field
|
2-13-2024 |
CA |
Sacramento |
|
|
Twin Rivers Unified School District
|
Multi-Site Outdoor Learning Shade Structures (WOODLAKE ES & FOOTHILL OAKS ES)
|
2-13-2024 |
CA |
National City |
|
|
|
Pavement Improvements at National City |
2-13-2024 |
CA |
Woodland |
|
|
Yolo County Office of Education
|
CCCS Addition to Outdoor Learning & ECE Expansion
|
2-13-2024 |
CA |
Los Angeles County |
|
|
Caltrans |
Replace bridge deck on Rte. 103 |
2-14-2024 |
CA |
Los Angeles County |
|
|
Caltrans |
Replace bridge deck on Rte. 103 |
2-14-2024 |
CA |
|
|
013824 |
Oro Loma Sanitary District
|
Sewer Collection System Pipeline Rehabilitation and Replacement Project Phase 5
|
2-14-2024 |
CA |
Vista |
|
|
|
Inland Rail Trail Phase 3B Bikeway |
2-14-2024 |
CA |
Kern County |
|
STPL-5227(071) |
|
2023 Randolph Street and High Street Pavement Resurfacing and Rehabilitation
|
2-15 -2024 |
CA |
Sacramento |
|
|
Twin Rivers Unified School District
|
Multi-Site Outdoor Learning Shade Structures (PIONEER ES & HIGHLANDS HS)
|
2-15-2024 |
CA |
|
|
ATPSB1L-6143(088) |
Transportation Agency for Monterey County
|
Canyon Del Rey Segment of the Fort Ord Regional Trail and Greenway
|
2-15-2024 |
CA |
|
|
ATPSB1L-6143(088) |
Transportation Agency for Monterey County
|
Canyon Del Rey Segment of the Fort Ord Regional Trail and Greenway
|
2-15-2024 |
CA |
|
|
ATPSB1L-6143(088) |
Transportation Agency for Monterey County
|
Canyon Del Rey Segment of the Fort Ord Regional Trail and Greenway
|
2-15-2024 |
CA |
Kern County |
|
STPL-5227(071) |
|
2023 Randolph Street and High Street Pavement Resurfacing and Rehabilitation
|
2-15 -2024 |
CA |
|
|
2023-BT-072 |
Golden Gate Bridge, Highway and Transportation District
|
San Rafael Bus Facility Parking Lot Improvements and
Solar Panel Installation Project
|
2-15-2024 |
CA |
|
|
C011224 |
REDLANDS UNIFIED SCHOOL DISTRICT
|
Water Well Repair at Redland East Valley High School
|
2-16-2024 |
CA |
|
|
594055 |
Department of Public Works County of Humboldt
|
Mattole Road Over Mattole Bridge
|
2-20-2024 |
CA |
Temecula |
|
D2009/D2121 |
Rancho California Water District
|
New Pad for Future Well No. 173 and UVDC Well No. 175 Graded Pad and Discharge Piping
|
2-20-2024 |
CA |
|
|
04-4J4604 |
|
Replace curb ramps, sidewalk, driveway, lighting, & signal.
|
2-21-2024 |
CA |
|
|
04-4J4604 |
|
Replace curb ramps, sidewalk, driveway, lighting, & signal.
|
2-21-2024 |
CA |
|
|
44551 |
Ravenswood City School District
|
Gale Wilson Middle School Increment 2: New Gymnasium
|
2-21-2024 |
CA |
Lake Elsinore |
|
|
|
Lake Elsinore, Minor Concrete, Rock Mulch & Blanket |
2-21-2024 |
CA |
|
|
2250 |
Morgan Hill Unified School District
|
Britton Middle School Auditorium Roofing and HVAC Project
|
2-21-2024 |
CA |
|
|
300514 |
County of San Luis Obispo County
|
|
2-22-2024 |
CA |
|
|
18-12B |
City of El Paso de Robles
|
Recycled Water Distribution System
|
2-22-2024 |
CA |
|
|
300514 |
County of San Luis Obispo County
|
|
2-22-2024 |
CA |
|
|
04-2Q7604 |
|
Rectangular rapid flashing beacon systems, HMA, curb ramp and SW.
|
2-22-2024 |
CA |
Riverside County |
|
08-1J7104 |
|
Structure excavation, partially grouted RSP, and RHMA.
|
2-22-2024 |
CA |
Riverside County |
|
08-1J7104 |
|
Structure excavation, partially grouted RSP, and RHMA.
|
2-22-2024 |
CA |
|
|
18-12B |
|
Recycled Water Distribution System
|
2-22-2024 |
CA |
|
|
01-0H1504 |
|
HMA, RHMA, and geosynthetic pavement interlayer
|
2-22-2024 |
CA |
|
|
01-0H1504 |
|
HMA, RHMA, and geosynthetic pavement interlayer
|
2-22-2024 |
CA |
|
|
C31889 C31891 |
|
Storm Damage Slide Repair Stewarts Point Skaggs Springs Road
|
2-27-2024 |
CA |
|
|
21226 |
Farfield-Suisun Unified School District
|
Gale Wilson Middle School Increment 2: New Gymnasium
|
2-27-2024 |
CA |
|
|
C31889 |
|
Storm damage slide repair work at Stewarts Point Skaggs Springs Road PM 21.01
|
2-27-2024 |
CA |
|
|
C31881 |
|
Storm damage slide repair work at two sites along Stewarts Point Skaggs Springs Road PM 13.61 and 13.97
|
2-27-2024 |
CA |
San Diego County |
|
|
|
Gillespie Field 09L-27R Runway Rehabilitation |
2-28-2024 |
CA |
|
|
05-0N7054 |
|
HWY 101: Santa Barbara (Segment 4E South)
|
3-5-2024 |
CA |
San Jacinto |
|
|
Eastern Municipal Water District |
San Jacinto Valley Groundwater Treatment Plant |
3-7-2024 |
CA |
|
|
CIP-8239 |
|
ARPA City Wide CMP Replacement Project – Phase 2
|
3-7-2024 |
CA |
RIVERSIDE COUNTY |
|
|
|
Hot mix asphalt, soil nail, structural concrete and roadway Exc. |
3-12-2024 |
CA |
RIVERSIDE COUNTY |
|
|
|
Hot mix asphalt, soil nail, structural concrete and roadway Exc. |
3-12-2024 |
CA |
Temecula |
|
08-1G6704 |
|
Hot mix asphalt, soil nail, structural concrete and roadway Exc
|
3-12-2024 |
CA |
Temecula |
|
|
|
79 Pauba to Sage |
3-12-2024 |
CA |
Riverside County |
|
|
Caltrans |
Construction on State Highway in Riverside County Near Temecula from 0.4 Mile South of Sage Road to 1.1 Miles South of Pauba Road. |
3-12-2024 |
CA |
Riverside County |
|
08-1G6704 |
|
Hot mix asphalt, soil nail, structural concrete and roadway Exc..
|
3-12-2024 |
CA |
|
|
24-006 |
|
Sewer Collection System And Headworks Improvements
|
3-13-2024 |
CA |
Los Angeles County |
|
|
|
Pier B On-Dock Rail Support Facility |
3-19-2024 |
CA |
Los Angeles County |
|
|
|
Pier B On-Dock Rail Support Facility |
3-19-2024 |
CA |
Los Angeles County |
|
|
|
Pier B On-Dock Rail Support Facility |
3-19-2024 |
CA |
Santa Rosa |
|
060023 |
|
Project Managers • Estimators • Project Coordinators
|
|