www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date January 3rd, 2024 @ 4:03 p.m. through bid opening date

Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:

Agency: Caltrans No. 06-1A4604
Project: Construction on State Highway In Fresno County At Yokuts Valley From 0.2 Mile East Of George Smith Road To Elwood Road.
Plans & Specs are available for review at our office or online at: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=06-1A4604
Bids open Thursday, January 18, 2024, at 2:00 PM
Project estimated construction cost is $2,240,000.
DBE Goal: 21%

Estimating Dept.
Email: estimating@papichconstruction.com

Description: HMA (Type A), HMA-OGFC, CL2 aggregate base and roadway excavation.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to:Lead Compliance Plan, Time-Related Overhead (Wday), Develop Water Supply, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Stormwater Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Imported Borrow (Cy), Move-In/Move-Out (Erosion Control), Rolled Erosion Control Product (Netting), Hydromulch, Fiber Rolls, Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Hot Mix Asphalt-Open Graded (Open Graded Friction Course), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Pavement (Sqft), Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, (F) - Structural Concrete, Headwall, (F) - Minor Concrete, (F) - Bar Reinforcing Steel, Stress Reducing Slab, 18" Corrugated Steel Pipe (.079" Thick), 30" Corrugated Steel Pipe (.109" Thick), 42" Corrugated Steel Pipe (.109" Thick), 18" Steel Flared End Section, 30" Steel Flared End Section, 42" Steel Flared End Section, Remove Culvert (Lf), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Relocate Mailbox, Temporary Fence (Wildlife Exclusion California Tiger Salamander), Pavement Marker (Retroreflective), Marker (Culvert), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Thermoplastic Pavement Marking, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Traffic Monitoring Station System, Mobilization

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME