www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date January 23, 2024 @ 3:00 p.m. through bid opening date


Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:

Agency: City of Paso Robles | DPW Project No. 18-12B
Project: Recycled Water Distribution System
Bids open Bids open Thursday, February 22, 2024, at 2:00 PM
DBE/WBE/MBE Participation

Plans & Specs:  https://www.prcity.com/Bids.aspx
This project is funded by the Clean Water State Revolving fund

Estimating Dept.
Email: estimating@papichconstruction.com

General work description: Constructing a recycled water pump station and electrical building inside the City’s wastewater treatment plant, a new 900,000 gallon recycled water storage tank near Priska Drive, the Buena Vista turnout facility, a de-chlorination station at Barney Schwartz Park, auger bore crossing of Highway 46, approximately 18,000 LF of 6-inch to 24-inch distribution pipelines with appurtenances, approximately 16,000 LF of 2-inch and 4-inch fiber optic conduit with handholes, and electrical and remote control systems for a complete in-place operational recycled water distribution system.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Mobilization, Recycled Water Pump Station, Recycled Water Storage Tank, Dechlorination Station, Buena Vista Turnout, 24-Inch Class 250 Dip (Open Cut), 16-Inch Class 250 Dip (Open Cut), 8-Inch C900 Pvc Pipe (Open Cut), 6-Inch C900 Pvc Pipe (Open Cut), Highway 46 Crossing (Pilot Tube Auger Bore), Auger Bore Jacking Shaft, Auger Bore Receiving Shaft, 4-Inch Fiber Optic Conduit (Direct Buried), 2-Inch Fiber Optic Conduit (Direct Buried), Two 4-Inch Pg&E Electric Conduit In Duct Bank, Manhole/Handhole Per Detail Em900, Permanent Ac Paving, Aggregate Base Course For Roads, 2-Inch Air And Vacuum Release Valve Per Detail G-8 Modified, 2-Inch Slow Closing Venting Vacuum Relief Valve Per Detail G-8 Modified, 1-Inch Air And Vacuum Release Valve Per Detail G-8 Modified, 6-Inch Blowoff Assembly Per Detail G-9 Modified, 4-Inch Blowoff Assembly Per Detail G-9 Modified, Rw Hydrant Per Detail G-1 Modified, 24-Inch Butterfly Valve Per Detail P026, 16-Inch Butterfly Valve Per Detail P026 (Sim), 8-Inch Gate Valve Per Detail G-6 Modified, 6-Inch Gate Valve Per Detail G-6 Modified, 4-Inch Gate Valve Per Detail G-6 Modified, 1-Inch Rw Service Per G-2 Modified, 2-Inch Rw Service Per G-3 Modified, 4-Inch Rw Service Per P900, Trench Cut-Off Wall Per Detail P014, Temporary Excavation Support, Traffic Control, Dust Control And Storm Water Pollution Prevention, Mitigation And Monitoring Plan Requirements, Settlement Monitoring, Existing Utility Locate Per Section 02280, Cost For 20 Additional Potholes, Hydroseeding And Bonded Fiber Matrix, Bioretention Basins, Overflow And Swale Per Details Sw-6, Sw-22, Sw-22A, And C900, Earthquake Insurance, Fabrication And Supply Of Non-Vendor Plc/Rtu Control Panels, Control System Integration By Tough Automation, Commissioning, Demobilization (3% Max), Monument Re-Establishment Per Detail U-5, Re-Establishment Per Detail U-5

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME