www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date January 11, 2024 @ 4:23 p.m. through bid opening date

 

Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers
performing commercially useful functions for the following project:

Please see the attached invitation to bid from Crosstown Electrical & Data, Inc for the following project:
Owner: Caltrans No. 07-349504
DBE Goal: 22% The estimated cost of the project is $10,100,000

Install new transportation management system elements

Bids open Thursday, January 18, 2024 at 2:00 PM

Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=07-349504&sub=

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution-Board-Related Tasks, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Type Iii Barricade, Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System Day, Temporary Pavement Marker, Temporary Barrier System, Temporary Crash Cushion Module, Alternative Temporary Crash Cushion Tl-3, Job Site Management, Water Pollution Control Program, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Treated Wood Waste, Remove Concrete (Sqyd), Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Roadway Excavation (Type Com) (Aerially Deposited Lead), Roadside Clearing, Prune Existing Plants, Slow-Release Fertilizer, Plant (Group A), Plant (Group U), Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors, Riser Sprinkler Assembly (Gear Driven), Riser Sprinkler Assembly, 3" Gate Valve, (F) - 3/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Class 315) (Supply Line), (F) - 3" Plastic Pipe (Class 315) (Supply Line), 8" Welded Steel Pipe Conduit, Class 2 Aggregate Base (Cy), Class 3 Aggregate Base (Cy), Lean Concrete Base, Base Bond Breaker, Prime Coat, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Pavement (Sqft), Remove Asphalt Concrete Dike, Minor Concrete (Curb) (Cy), Minor Concrete (Gutter) (Cy), Minor Concrete (Stamped Concrete), Remove Concrete (Curb And Gutter), Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Remove Roadside Sign (Wood Post), Remove Roadside Sign (Metal Post), Remove Roadside Sign (Strap And Saddle Bracket Method), Remove Roadside Sign Panel, Relocate Roadside Sign, Furnish Laminated Panel Sign (2 1/2"-Type H), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"- Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Metal (Roadside Sign), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Roadside Sign Panel On Existing Post, Install Roadside Sign (Laminated Wood Box Post), Midwest Guardrail System (Wood Post), Vegetation Control (Minor Concrete), End Cap (Type A), End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Alternative Crash Cushion Tl-3, Remove Guardrail, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Preformed Thermoplastic Pavement Marking, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Painted Traffic Stripe, Remove Painted Pavement Marking, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 6" Traffic Stripe Tape (Broken 17-7), Maintaining Existing Traffic Management System Elements During Construction, Ramp Metering System, Camera Systems, Modifying Fiber Optic Cable Systems, Modifying Camera Systems, Modifying Ramp Metering Systems, Mobilization

Crosstown Electrical & Data, Inc is an Equal Opportunity Employer. We will assist with obtaining bonding, lines of credit, and insurance. The US Small Business Administration may assist you in obtaining bonding - please visit: http://www.sba.gov/content/contractors#  for additional information, the local Small Business Development Center Network ( www.californiasbdc.org ) and/or the Minority Business Development Center ( www.mbda.gov). Subcontractors must possess a current contractor’s license, insurance, workers compensation and be registered with a current DIR number. Please let Crosstown Electrical & Data, Inc know if you plan to bid on this project by emailing Andrea Heermance  estimating@crosstowndata.com or completing and returning the attached response form.

Crosstown Electrical & Data, Inc
License #756309
5454 Diaz Street
Irwindale, CA 91706
Phone (626) 813‐6693

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME