www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date January 18th, 2023 @ 10:22 a.m. through bid opening date

An Equal Opportunity Employer

Specialty Construction, Inc. Requests Sub-bids from All Qualified & Certified DBE/MBE/WBE/SBE/SBRA/LSAF/HUB/MBE/WBE/SBE/SBRA/LSAF/HUB Subcontractors/Suppliers for:
Agency: City of El Paso de Robles | DPW Project No. 18-12B
Project: Recycled Water Distribution System
Bid Date: February 22, 2024 at 2:00 PM
Plans and Specs are available at the following link:
24-004 - Recycled Water Distribution System, Paso Robles

***Addendums 1-3 have been issued***

General work description: Constructing a recycled water pump station and electrical building inside the City’s wastewater treatment plant, a new 900,000 gallon recycled water storage tank near Priska Drive, the Buena Vista turnout facility, a de-chlorination station at Barney Schwartz Park, auger bore crossing of Highway 46, approximately 18,000 LF of 6-inch to 24-inch distribution pipelines with appurtenances, approximately 16,000 LF of 2-inch and 4-inch fiber optic conduit with handholes, and electrical and remote control systems for a complete in-place operational recycled water distribution system.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Mobilization (3% Max), Recycled Water Pump Station, Recycled Water Storage Tank, Dechlorination Station, Buena Vista Turnout, 24-Inch Class 250 Dip (Open Cut), 16-Inch Class 250 Dip (Open Cut), 8-Inch C900 Pvc Pipe (Open Cut), 6-Inch C900 Pvc Pipe (Open Cut), Highway 46 Crossing (Pilot Tube Auger Bore), Auger Bore Jacking Shaft, Auger Bore Receiving Shaft, 4-Inch Fiber Optic Conduit (Direct Buried), 2-Inch Fiber Optic Conduit (Direct Buried), Two 4-Inch Pg&E Electric Conduit In Duct Bank, Manhole/Handhole Per Detail Em900, Permanent Ac Paving, Aggregate Base Course For Roads, 2-Inch Air And Vacuum Release Valve Per Detail G-8 Modified, 2-Inch Slow Closing Venting Vacuum Relief Valve Per Detail G-8 Modified, 1-Inch Air And Vacuum Release Valve Per Detail G-8 Modified, 6-Inch Blowoff Assembly Per Detail G-9 Modified, 4-Inch Blowoff Assembly Per Detail G-9 Modified, Rw Hydrant Per Detail G-1 Modified, 24-Inch Butterfly Valve Per Detail P026, 16-Inch Butterfly Valve Per Detail P026 (Sim), 8-Inch Gate Valve Per Detail G-6 Modified, 6-Inch Gate Valve Per Detail G-6 Modified, 4-Inch Gate Valve Per Detail G-6 Modified, 1-Inch Rw Service Per G-2 Modified, 2-Inch Rw Service Per G-3 Modified, 4-Inch Rw Service Per P900, Trench Cut-Off Wall Per Detail P014, Temporary Excavation Support, Traffic Control, Dust Control And Storm Water Pollution Prevention, Mitigation And Monitoring Plan Requirements, Settlement Monitoring, Existing Utility Locate Per Section 02280, Cost For 20 Additional Potholes, Hydroseeding And Bonded Fiber Matrix, Bioretention Basins, Overflow And Swale Per Details Sw-6, Sw-22, Sw-22A, And C900, Earthquake Insurance, Fabrication And Supply Of Non-Vendor Plc/Rtu Control Panels, Control System Integration By Tough Automation, Commissioning, Demobilization (3% Max), Monument Re-Establishment Per Detail U-5, Re-Establishment Per Detail U-5

Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested DBE/MBE/WBE/SBE/SBRA/LSAF/HUB/MBE/WBE/SBE/SBRA/LSAF/HUB firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price. SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate. For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents

Specialty Construction, Inc.     
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722

Contacts:
Sheri Shamblin : Shamblin@specialtyconstruction.com

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME