REQUEST FOR QUALIFIED
DISADVANTAGED
SUBCONTRACTORS, VENDORS, AND/OR
SERVICE PROVIDERS FOR:
USEPA, SBA, MBE, WBE, SBRA, LSFA, DOT, HUBzone, Tribal, State & Local Governments & Independent Private Organization Certifications accepted
BID DATE: June 7, 2016 at 3:00 p.m.
PROJECT NAME: Phase 2 Regional Transmission Main – Segment A1
Bid File No. 3449-2
OWNER: City
of Fresno
PROJECT LOCATION: The project is generally located east of the 41 on Olive Avenue, Fresno CA.
PROJECT DESCRIPTION: The work to be performed under the specifications for Bid File No.3449 – 2 includes the furnishing of labor, materials, equipment, and services for the construction of about five miles of welded steel pipeline ranging from 54-inches to 66-inches in diameter. The facilities to be constructed include, but are not limited to the following: about 5 miles of 54- to 66-inch diameter steel pipe, pipeline appurtenances (air valves, blowoff, access manways), cathodic protection system, two tunneled crossings of major streets, street paving and traffic control.
L. H. WOODS & SONS, INC.
(LHWS) IS ACCEPTING QUOTES
FOR THE FOLLOWING WORK (BUT NOT
LIMITED TO):
(LHWS is an Equal Opportunity Employer)
(Performance/Payment/Supply bond may be
required)
SWPPP, Traffic Control, Steel Pipe, Supply House Materials, Aggregates, Concrete, Cathodic Protection, AC Paving, Jack & Bore, Precast Concrete, Electrical, Fiber Optics, Fencing, AC Paving, Traffic Signal, Pavement Markings, Street Lighting and Welding.
Contact: Leslie Brazier
2115 La Mirada Drive, Vista
CA 92081
lbrazier@lhwoods.com
Phone: 760/599-5500
Fax: 760/ 599-5510
Plans and specifications are
available at no cost for review in our office between the hours of 8:00 a.m.
and 4:00 p.m. M-F or from the City of Fresno at http://www.fresno.gov.
LHWS encourages all interested SBE, DVBE, MBE, WBE and OBE companies to
contact us at least 2 days prior to the bid due date to review with us your
proposed scope of work. If bonds are required, LHWS will pay the cost of
the bond to a maximum of 1% of the contract value. LHWS is willing to assist
all SBE, DVBE, MBE, WBE, AND OBE subcontractors/suppliers in obtaining bonds,
lines of credit, and/or insurance. Please contact Nancy Fryman at LHWS at
the address and phone number above for assistance. LHWS is willing to
work with all qualified subcontractors/suppliers to establish acceptable
delivery schedules, when work requirements permit. The schedule is the
sole responsibility of LHWS and will not be mutually agreed upon.
Subcontractors will be required to abide by the terms of the AGC Master Labor
Agreements and to execute an agreement utilizing the latest L. H. Woods &
Sons, Inc. Standard Subcontract/Purchase Agreement incorporating prime contract
terms and conditions, including payment provisions. Copies of Standard
Subcontract/Purchase Agreement are available for review at www.lhwoods.com. L. H. Woods & Sons’ listing of
a subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included
with the Subcontractor’s price quote.
|