Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

Advertisement date January 28th, 2016 through bid opening date

AMES Construction Inc.AMES CONSTRUCTION, INC.American Flag
      391 N. Main St., Ste 302
Corona, CA 92880
(951) 356-1275/(951) 549-9003 FAX

SUBCONTRACTOR REQUEST FOR QUOTATION

Ames Construction, Inc. is seeking certified and qualified SBE/WBE/DVBE/DBE & UDBE subcontractors and/or suppliers for the following project:

 

PROJECT:                                           Kings River Pipeline – Bid File No. 3433 – Phase Two
OWNER:                                            City of Fresno

BID DATE/TIME:                              March 15, 2016 @ 3:00 PM

PLEASE SUBMIT BID TO:              Ames Construction, Inc.
                                                              391 N. Main St., Ste 302
                                                              Corona, CA 92880
                                                              Phone: (951) 356-1275
                                                              Fax: (951) 549-9003

SBE/WBE/DVBE/DBE & UDBE Subs/Suppliers required include but are not limited to: Dewatering, rebar, electrical, instrumentation, AC paving, trucking, welding, quality control, coatings and linings, clear and grub, riprap, excavation, underground utility, traffic control, backfilling, equipment rental, fencing, surveying, pipe supply, WSP pipe, misc metal, pavement marking, construction area signs, erosion control, concrete pumping,  valves and fittings, ready mix concrete, aggregate base, sand, aggregates, precast box culvert, structural steel, shoring, geotextile fabrics, riprap, pre-cast vaults.   Ames intends to conduct itself in good faith with DBE firms for participation on this project.  Ames will work with subcontractors to breakdown items into economical feasible packages.

Ames will require bidder to provide performance and payment bonds for the full amount of the Subcontract values.  Costs of the bonds are to be provided as a separate line item. Please call to discuss how Ames Construction, Inc. can assist you in your bonding, credit and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, materials or related assistance for this project. We are an equal opportunity employer. Ames’ Subcontract terms and conditions will apply to any contracts resulting from this request. The Subcontractor, by submission of its bid, agrees to the “Terms and Conditions” including all Exhibits and Attachments of Ames Subcontract Agreement. Ames reserves the right to accept or reject any or all quotations.

Pricing submitted to Ames construction for this project must be valid and may not be withdrawn for 90 calendar days from the date of bid opening.

 

Our contact for this project is Chris Acosta. He can be reached at (951) 356-1275 or by email chrisacosta@amesco.com. Please fax quotes to (951) 549-9003.

 

Plans and specifications can be viewed and downloaded at:  

Published on January 28th, 2016 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME