Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: January 27th, 2016 through bid opening date

L.H. Woods & Sons, Inc.

REQUEST FOR QUALIFIED DISADVANTAGED

SUBCONTRACTORS, VENDORS, AND/OR SERVICE PROVIDERS FOR:

USEPA, SBA, DOT dbe, Tribal, State & Local Governments & Independent Private Organization Certifications accepted

 

BID DATE:                            March 15, 2016 at 3:00 p.m.

PROJECT NAME:                 Kings River Pipeline
                                                Bid File No. 3433 – Phase Two

OWNER:                                City of Fresno  

PROJECT LOCATION:         The project is generally located from the SE Surface Water Treatment Facility on N. Armstrong Ave, along Belmont Ave to Trimmer Springs Road, Fresno, CA

PROJECT DESCRIPTION:   The project includes the installation of approximately 13 miles of 72-inch diameter steel pipe, pipeline appurtenances (air valves, blow-offs, access manways), cathodic protection, canal weir structure, diversion structure with traveling screen and isolation gate, meter vault, instrumentation and control, communications antenna, new and replacement fencing and gates, diversion grading, street paving and appurtenances, and incidentals.

 

L. H. WOODS & SONS, INC. (LHWS) IS ACCEPTING QUOTES

FOR THE FOLLOWING WORK (BUT NOT LIMITED TO):

(LHWS is an Equal Opportunity Employer)

(Performance/Payment/Supply bond may be required)  

Aggregates, AC Paving, Tunneling (Jack & Bore), Fiber Optic, Concrete, Precast Concrete, Cathodic Protection, Pipe, Supply House Materials, SWPPP, Traffic Control, Welding, Electrical, Fence, Instruments & Controls, Electrical Apparatus.  

Contact:       Nancy Fryman

2115 La Mirada Drive, Vista CA  92081

nfryman@lhwoods.com

Phone:          760/599-5500, ext. 214    Fax: 760/ 599-5510

 

Plans and specifications are available at no cost for review in our office between the hours of 8:00 a.m. and 4:00 p.m. M-F or from the City of Fresno at http://www.fresno.gov. 

 

LHWS encourages all interested SBE, DVBE, MBE, WBE and OBE companies to contact us at least 2 days prior to the bid due date to review with us your proposed scope of work.  If bonds are required, LHWS will pay the cost of the bond to a maximum of 1% of the contract value.  LHWS is willing to assist all SBE, DVBE, MBE, WBE, AND OBE subcontractors/suppliers in obtaining bonds, lines of credit, and/or insurance.  Please contact Nancy Fryman at LHWS at the address and phone number above for assistance.  LHWS is willing to work with all qualified subcontractors/suppliers to establish acceptable delivery schedules, when work requirements permit.  The schedule is the sole responsibility of LHWS and will not be mutually agreed upon. Subcontractors will be required to abide by the terms of the AGC Master Labor Agreements and to execute an agreement utilizing the latest L. H. Woods & Sons, Inc. Standard Subcontract/Purchase Agreement incorporating prime contract terms and conditions, including payment provisions.  Copies of Standard Subcontract/Purchase Agreement are available for review at www.lhwoods.com.  L. H. Woods & Sons’ listing of a subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with the Subcontractor’s price quote.

Published on January 27th, 2016 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME