Advertisement date December 29th, 2016 through bid opening date

AMES Construction Inc.AMES CONSTRUCTION, INC.American Flag
      391 N. Main St., Ste 302
Corona, CA 92880
(951) 356-1275/(951) 549-9003 FAX

SUBCONTRACTOR REQUEST FOR QUOTATION

Ames Construction, Inc. is seeking certified and qualified DBE subcontractors and/or suppliers to meet the 4.7% goal for the following:

PROJECT:                                         I-15 / SR 79 SOUTH ULTIMATE INTERCHANGE
OWNER:                                            City of Temecula, Department of Public Works

BID DATE/TIME:                              January 24th, 2017 @ 2:00 PM

PLEASE SUBMIT BID TO:              Ames Construction, Inc.

391 N. Main St., Ste 302

Corona, CA 92880

Phone: (951) 356-1275

Fax: (951) 549-9003

 

DBE Subs/Suppliers required include but are not limited to: Lead compliance, signs – construction area/roadway/pcms and structures, traffic control, barricades, pavement markings, object markers and delineators, electrical, signal and lighting, k-rail, swppp, rain event plan, erosion control, demo, Biologist, cold-plane, clear & grub, dev water supply, dust palliative, roadway and structural excavation, sand backfill, rock blanket, soil amendment, landscape and irrigation, pipe supply, valve & fitting supply, hydro seed, aggregates – base/sub-base, sand, lean concrete base, HMMA, concrete dike rubberized HMA, jointed plain concrete pavement, joint seal, isolation joint seal, f & d steel piling, CIDH concrete piles, PS CIP concrete, structural concrete, minor concrete, fractured rib texture, rebar, concrete supply, sign structure, alternate pipe culvert, concrete backfill, permeable material, drainage, RSP geo-synthetic supply, fencing, guard rail, railing, concrete barrier, welding underground utilities and cathodic protection. Ames intends to conduct itself in good faith with DBE firms for participation on this project.  Ames will work with subcontractors to breakdown items into economical feasible packages.

Ames will require bidder to provide performance and payment bonds for the full amount of the Subcontract values.  Costs of the bonds are to be provided as a separate line item. Please call to discuss how Ames Construction, Inc. can assist you in your bonding, credit and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. We are an equal opportunity employer. Ames’ Subcontract terms and conditions will apply to any contracts resulting from this request. The Subcontractor, by submission of its bid, agrees to the “Terms and Conditions” including all Exhibits and Attachments of Ames Subcontract Agreement. Ames reserves the right to accept or reject any or all quotations.
Pricing submitted to Ames construction for this project must be valid and may not be withdrawn for 120 calendar days from the date of bid opening.

 

Our contact for this project is Chris Acosta. He can be reached at (951) 356-1275. Please fax quotes to (951) 549-9003. Plans and specifications can be viewed and downloaded at:  
https://ames.sharefile.com/d/4e10051b08a64b6d

Published on December 29th, 2016 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME