Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: September 23rd, 2015 through bid opening date

R.A. Nemetz Construction Co., Inc.

An Equal Opportunity Employer
Is requesting quotations from all qualified
DBE
Sub-contractors and material suppliers for the following project:

Construction on State Highway In Alameda County In Oakland 0.3 mile South of Broadway Terrace Undercrossing Alameda County on Route 13 Near Broadway Terrace

Contract No. 04-2G8304 Federal Aid Project ACSTP-ER-19C1(004)E

 

Bid Date: Tuesday October 13, 2015

 

This request includes the following:

 

Lead Compliance Plan, Progress Schedule (Critical Path Method), Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (LS), temporary Railing (Type K), Temporary Alternative Crash Cushion, Job Site Managerment, Prepare Water Pollution Control Program, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Reinforced Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Active Treatment System, Temporary Concrete Washout, Remove Culvert (LF), Modify Inlet, Culvert Slurry-Cement Backfill, Remove Steel Crib Wall (Portion), Develop Water Supply, Roadway Excavation, Structure Excavation (Crib Wall), Structure Excavation (Soldier Pile Wall), Structure Backfill (Crib Wall), Structure Backfill (Soldier Pile Wall), Concrete Backfill (Soldier Pile Wall), Lean Concrete Backfill, Roadside Cleaning, Soil amendment, Slow-Release Fertilizer, Plant (Group I), Plant Establishment Work, Wood Mulch, Foliage Protector, 1” WYE Strainer Assembly, Riser Sprinkler Assembly, Cam Coupler Assembly, ¾” Plastic Pipe (Schedule 40) (Supply Line), 1” Plastic Pipe (Schedule 40) (Supply Line), 1 ¼” Plastic Pipe (Schedule 40) (Supply Line), Move-In/Move-Out (Erosion Control), Hydromulch, Fiber Rolls, Hydroseed, Ground Anchor (Subhorizontal), steel Crib Wall, steel Soldier Pile (W 14 X 132), Steel Soldier Pile (W 14 X 211), 30” Drilled Hole, Structural Concrete, Retaining Wall, Minor Concrete, Minor Concrete (Minor Structure), Bar Reinforcing Steel (Retaining Wall), Sculpted Shotcrete, Structural Shotcrete, Timber Lagging, Clean & Pint Soldier Piling, Prepare & Stain Shotcrete, Anti-Graffiti Coating, 18” Alternative Pipe Culvert, 12” corrugated Steel Pipe (.079” Thick), geocomposite Drain, Furnish & Install Drain Pipe (Horizontal Drain), Drill Hole (Horizontal Drain), 36” Corrugated Steel Pipe Inlet (.109” Thick), Minor Concrete (Gutter) (LF), Miscellaneous Iron & Steel, Temporary Fence (Type CL-6), Chain Link Railing (Modified), Cable Railing (Modified), Mobilization.

NOTE:  R.A. NEMETZ IS WILLING TO BREAK ITEMS OF WORK INTO SMALLER INCREMENTS TO ASSIST DBE CONTRACTORS & SUPPLIERS IN OBTAINING WORK ON THIS PROJECT.  Please contact us for details.

Please call if you need assistance in obtaining bonding or insurance.

Plans & Specifications are available for viewing at our office or obtained from the Owner or portions may be emailed upon request.

R.A. Nemetz Construction Co., Inc.
PO Box 5306
Galt, CA 95632
Phone: (209) 744-1001     Fax: (209) 744-1005
Contact: Rob Nemetz
Rob@ranemetz.com

Published on September 23rd, 2015 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME