OWNER: County of Marin
PROJECT #: County Project No. 2015-11
DESCRIPTION: 2015 Emergency Slide Repair Project Lucas Valley Road MP 1.66
BID DATE & TIME: 3/19/15 @ 2:00PM
SUBMIT QUOTES BY: 3/19/15 @ 12:00PM
ENGINEER’S ESTIMATE: $250,000.00 / 45 WD / $1,000.00 per calendar day LD
DBE GOAL: 12%
Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors and suppliers for the 2015 Emergency Slide Repair project on Lucas Valley Road MP 1.66 in Marin County, CA. This project consists of a 54 foot long cast-in-drilled-hole wall with tiebacks on Lucas Valley Road at Milepost 1.66. The work will include grinding, resurfacing, drilling, excavation, traffic control, and other miscellaneous items not mentioned that are required by the Plans, the Standard Specifications, and the Special Provisions.
Quotes requested include, but are not limited to, the following scopes of work:
SIGNS AND TRAFFIC CONTROL, CLEARING AND GRUBBING, CIDH PIERS – 24” DIAMETER, PIER CAP – 24” WIDE, TIEBACKS – 1” DIAMETER, FULL LANE PAVEMENT GRINDING, TRAFFIC STRIPING, ROCK SLOPE PROTECTION, STREET SWEEPING, EROSION CONTROL, AGGREGATE, ASPHALT, CONCRETE SUPPLY AND TRUCKING
GCC is available to discuss breaking out any portion of work to encourage minority participation*
Plans, specifications and project requirements available at the Department of Public
Works, County of Marin, Room 404, Civic Center, San Rafael, California, and may be purchased for $40.00 per set (non-refundable). There will be a $12.00 service fee for returned checks. Mailed requests shall be addressed to the Department of Public Works, County of Marin, P.O. Box 4186, Civic Center, San Rafael, California 94913. For questions regarding the project, and/or plans & specifications, call (415) 473-7877. Plans may also be downloaded through local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Mr. Jeff Bordessa (707/585-1221 or jeffb@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html , local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required.