Ghilotti Construction Company, Inc.

License# 644515

An Equal Opportunity Employer

**SEEKING DBE SUBCONTRACTORS / SUPPLIERS**

OWNER:                                             Department of Transportation (Caltrans)
PROJECT #:                                      # 01-262054
DESCRIPTION:                                 Hwy. 101 Willits, Mendocino County, (01-Men-101-45.0/50.8)
BID DATE & TIME:                         3/12/15 @ 2:00PM
SUBMIT QUOTES BY:                     3/12/15 @ 12:00PM
ENGINEER’S ESTIMATE:              $11,800,000.00 / 1250 WD / $8,300.00 Day LD          
DBE GOAL:                                       9%

Ghilotti Construction Company is preparing a bid on the above referenced project. If your firm is interested in submitting a quote to us as a subcontractor and/or supplier, please advise us by FAX or phone ASAP. Your firm must be currently certified as a DBE firm with the Department of Transportation (Caltrans).  PLEASE SUBMIT A COPY OF YOUR CURRENT CERTIFICATION WITH YOUR BID.

Quotes requested include, but are not limited to, the following scopes of work:

TEMPORARY TACKED STRAW, COVER, FIBER ROLL, SILT FENCE, AND FENCE (TYPE ESA), TEMPORARY MARKER (TYPE ESA), CONTRACTOR SUPPLIED BIOLOGIST, INVASIVE PLANT REMOVAL (TARGET WEED), PLANT (GROUP W), INSTALL PLANT (GROUP W, M, M-M, 0-M), PLANT ESTABLISHMENT WORK, WOOD MULCH, MOVE-IN/MOVE OUT EROSION CONTROL (DRY SEED & DRILL SEED), STRAW (NATIVE GRASS), INCORPORATE MATERIALS, RIPPING, DISKING (EARTHWORK), ROCK SLOPE PROTECTION (FACING, METHOD B & NO. 3, METHOD B), CLEAN SAND AND GRAVEL, COBBLESTONE, TEMPORARY FENCE (TYPE CL-3), STREET SWEEPING, CONCRETE, AGGREGATE & ASPHALT SUPPLY AND TRUCKING

* GCC is available to discuss breaking out any portion of work to encourage minority participation*

Mr. Mark Mahboubi (707/585-1221 or markm@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108.  G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR.  Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa.  They may also be downloaded for free through the Department of Transportation via their website at http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html , local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required.

 

Published on February 10th, 2015 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME