OWNER: Department of Transportation (Caltrans)
PROJECT #: #04-3G1604
DESCRIPTION: Hwy 24 in Lafayette, Contra Costa County, CA – Construct multi-tiered slope stressing system - (04-CC-24-5.2/5.6)
BID DATE & TIME: 11/13/14 @ 2:00PM
SUBMIT QUOTES BY: 11/13/14 @ 12:00PM
ENGINEER’S ESTIMATE: $3,643,000.00 / 150 WD / $3,000.00 Day LD
SBE GOAL: 5%
Ghilotti Construction Company is preparing a bid on the above referenced project. If your firm is interested in submitting a quote to us as a subcontractor and/or supplier, please advise us by FAX or phone ASAP. Your firm must be currently certified as a DBE firm with the Department of Transportation (Caltrans). PLEASE SUBMIT A COPY OF YOUR CURRENT CERTIFICATION WITH YOUR BID.
Quotes requested include, but are not limited to, the following scopes of work:
CAS, TRAFFIC CONTROL SYSTEM, COLD PLANE AC PAVEMENT, CLEAR & GRUB, TACK COAT, SOIL NAIL, STRUCTURAL CONCRETE RETAINING WALL, CONCRETE SURFACE TEXTURE, BAR REINFORCING STEEL, STRUCTURAL STEEL, LANDSCAPE, IRRIGATION, MIDWEST GUARDRAIL SYSETM, VEGETATION CONTROL (CONCRETE), CABLE RAILING, TRAFFIC STRIPING, PAVEMENT MARKERS, STREET SWEEPING, EROSION CONTROL, CONCRETE, AGGREGATE & ASPHALT SUPPLY AND TRUCKING
* GCC is available to discuss breaking out any portion of work to encourage minority participation*
Mr. Thomas Smith (707/585-1221 or tom@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html , local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required.