An Equal Opportunity Employer
Is requesting quotations from all qualified
DBE
Sub-contractors and material suppliers for the following project:
County of Sacramento Municipal Services Department of Transportation
Vineyard Road at Laguna Creek Bridge Replacement Project
Contract #/4168
Federal Aid Project No. BRLO-5924(141)
Bid Date: Thursday, December 18, 2014 @ 2:00 PM
This request includes the following:
Temporary fence (Type ESA), SWPPP Preparation, Water Pollution Control, Project Information Sign, Temporary Retaining Wall, Abandon Storm Drain Manhole, Abandon Storm Drain Pipe, Remove Tree (Various Size), Remove Bollard, Remove Wood Post, Remove Wood Fence, Remove Sidewalk Barricade, Remove Traffic Stripe, Remove Pavement Marker, Remove Roadside Sign, Remove AC Path, Remove Storm Drain Pipe, Remove 72” Storm Drain Pipe, Remove Storm Drain Inlet, Remove 72” Storm Drain Headwall & Trash Rack, Salvage Vinyl 3-Rail Fence, Salvage Metal Beam Guard Railing, Relocate Irrigation Valve, Relocate 6” Blow Off Valve, Relocate Mailbox, Relocate Vinyl 3-Rail Fence, Relocate Chain Link Fence, Relocate Steel Fence Gate, Relocate Gate, Relocate 8”x8”x8’ Timber, Relocate Roadside Sign, Adjust Survey Monument to Grade, Adjust Storm Drain Manhole to Grade, Adjust Sanitary Sewer Manhole to Grade, Adjust Water Valve to Grade, Cold Plane Asphalt Concrete Pavement, Remove Concrete Driveway, Remove Concrete Curb & Gutter (Type 2), Remove Concrete Edge Band, Remove Concrete Sidewalk, Clearing & Grubbing, Roadway Excavation, Ditch Excavation, Imported Borrow, Gravel Driveway, Erosion Control (Hydroseed), Aggregate Base Class 2, Slurry Seal, Hot Mix Asphalt (Type A), Asphalt Rubber Hot Mix (Gap Graded), Place HMA Dike, Headwall With Trash Rack, Roadside Sign – One Post, Install Sign, (SSBM), 12” PVC Pipe (C900), 15” PVC Pipe (C900), 12 “ Reinforced Concrete Pipe, 15” Reinforced Concrete Pipe, 21” Reinforced Concrete Pipe, 72” Reinforced Concrete Pipe, 12” Corrugated Metal Pipe, Drop Inlet, Type B, Drop Inlet, Type C, Drop Inlet, Type F, Corrugated Metal Pipe Drainage Inlet, Type I, 48” Storm Drain Manhole, Type A Saddle Storm Drain Manhole, Rock Slope Protection Backing No. 2 (Method B), Rock Slope Protection Fabric, PCC Curb, (Type 3), PCC Curb (Type 4), PCC Curb (Type 2), PCC Driveway, PCC Sidewalk, PCC Sidewalk Ramp (Parallel), PCC Sidewalk Ramp (Plaza), PCC Median Crossing, PCC Median & Depressed Median Opening, Vinyl 3-Rail Fence, 8’ Wood Fence, K-1 Delineator, Removable Bollard (locking), Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Pavement Marker (Retroreflective), Remove & Replace Fiber Optic Pullbox With Manhole, Street Lighting, Pedestrian Traffic Signal Modification, Bridge Removal, Structure Excavation (Bridge), Structure Excavation (Type D), Structure Excavation (Retaining Wall), Structure Backfill, Structure Backfill (Retaining Wall), 24” Cast-In-Drilled-Hole Concrete Piles, Structural Concrete Bridge, Structural Concrete Retaining Wall, Structural Concrete Approach Slab (Type N0, Joint Seal (MR ½”), Bar Reinforcement Steel (Bridge), Bar Reinforcing Steel (Retaining Wall), Geocomposite Drain, Rock Slope Protection (1/4 Ton, Method B), PCC Curb, Type 4, Minor Concrete (Curb, Sidewalk & Curb Ramp), Chain Link Fence (Type C 1-4), Install Brass Survey Monuments, Concrete Barrier (Type ST 70 (Mod), Temporary Pedestrian Creek Crossing, Minor Concrete Removal, Place Survey Monument, Import Topsoil, Interlocking Concrete Pavers, Stone Veneer (Bridge Abutments and Median), Metal Finishing (Bridge Rail), Metal Silouettes (Bridge Architectural Treatment), Precase Medallions, Root Control Barrier, Redwood Headerboard, Repair Existing Irrigation & Landscape, Irrigation Controller & Enclosure, Sch. 40 Control Wire Conduit and Pullboxes, 1” Water Meter and Tap – POC 1, Existing Water Service Tap – POC 2, Master Valve, Flow Sensor, 1” Reduced Pressure Backflow Preventer & Enclosure, 4” Sch. 40 PVC Irrigation Sleeve, 2” Sch. 80 PVC Irrigation Sleeve, 2” Sch. 40 PVC Irrigation Mainline, 1 ½” Sch. 40 PVC Irrigation Mainline, 1 ¼” Ci. 200 Irrigation Lateral, 1” CI. 200 Irrigation Lateral, ¾” CI. 200 Irrigation Lateral, 1 ¼” Electronic Remote Control Valve Assembly, 1” Electronic Remote Control Valve Assembly, Quick Coupling Valves, Brass Gate Valve, 12” Pop-Up Spray Heads with Nozzle, 6” Pop-Up Spray Heads with Nozzle, Soil Preparation, Relocate Landscape Boulders, 36” Box Trees, 24” Box Trees, 5 Gallon Shrubs, 2 Gallon Shrubs/Ground Cover, 1 Gallon shrubs/Ground Cover, Bark Mulch, 120 Day Plant Establishment Period.
NOTE: R.A. NEMETZ IS WILLING TO BREAK ITEMS OF WORK INTO SMALLER INCREMENTS TO ASSIST DBE CONTRACTORS & SUPPLIERS IN OBTAINING WORK ON THIS PROJECT. Please contact us for details.
Please call if you need assistance in obtaining bonding or insurance.
Plans & Specifications are available for viewing at our office or obtained from the Owner or portions may be emailed upon request.
R.A. Nemetz Construction Co., Inc.
PO Box 5306
Galt, CA 95632
Phone: (209) 744-1001 Fax: (209) 744-1005
Contact: Rob Nemetz
Rob@ranemetz.com |