Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: July 12th, 2013 through bid opening date

Sub-Bids Requested from Qualified DBE Subcontractors & Suppliers:
I-15 Cajon Pass Rehabilitation Design Build Project
District 8 Route 15
Contract No.: 08-0Q7404
Bid Date: August 23, 2013 at 2:00 PM
Quotes Due: August 16, 2013 at 5:00 PM

Quotes requested for supplies & services including, but not limited to: AC Milling, Aggregate Base, AC Dike, AC Paving, Asphaltic Oils, Cement, Concrete Aggregates, Concrete Barrier Rail, Construction Area Signs, Curb & Gutter, Dowel Bars, Dowel Baskets, Electrical, Excavation, Fly Ash, Grind PCC, Geogrid Materials, Grind Rumble Strip, Joint Sealing, Landscape, Erosion Control, Metal Beam Guard Rail, Misc. Metals, Overhead Sign Panels, Pavement Removal, Precast Concrete Pavement Panels, QC Testing, Reinforcing Steel, Roadside Signs, Spall & Crack Repair, Striping & Marking, SWPPP, Lead Compliance Plan, Concrete Panel Replacement, Hauling.

Coffman Specialties & Parsons

9685 Via Excelencia, Ste 200· San Diego, CA 92126
Phone: (858) 536-3100 ·Fax: (858) 586-0164
Contact: Mitch Gamache ·Email: mitch@coffmanspecialties.com

Plans & Specifications are available for view at our main office in San Diego or by calling (858) 536-3100

Coffman is interested in soliciting in Good Faith with DBE’s for this project.  Please call if you need assistance/advice with obtaining Bonds/Insurance/Credit. Subcontractors may be required to furnish 100% Payment & Performance Bonds by an admitted surety and subject to approval by Coffman. Coffman Specialties, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Waiver of Subrogation will be required. In order to assist DBE Contractors and suppliers, we will divide total requirements into smaller tasks or quantities and establish delivery and construction schedules which will permit maximum participation when feasible. We are an EOE & seriously intend to negotiate with qualified firms. Non-DBE Subs/Suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be evaluated with your price.

Published on July 12th, 2013 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME