
License# 644515
An Equal Opportunity Employer
Is requesting quotations from all qualified DBE/MBE/WBE subcontractors and material suppliers for the following project:
Agency: Sonoma Valley County Sanitation District
Contract No. 71-712-7 #1
Project Name: Napa Salt Marsh Restoration Pipeline (Carneros Reservoir to Huichica Unit)
Project Description: Ghilotti Construction Company, Inc. is seeking certified SBE/DBE/MBE/WBE subcontractors and suppliers for the in Napa Salt Marsh Restoration Pipeline (Carneros Reservoir to Huichica Unit) in various locations in Sonoma County, CA. The work includes the installation of approximately 18,200 lineal feet of 18-inch diameter recycled water transmission pipeline by means of direct bury, horizontal directional drilling or bore and jack; pipe appurtenances and incidental related work.
Engineer's Estimate: $5 – 6,000,000.00
200 CD / $1,800.00 per day LD
Submit quotes by 8:00 a.m. on bid date.
Contact our estimator for more information or assistance.
GCC is available to discuss breaking out any portion of work to encourage minority participation.
Location: Sonoma County
Bid Date: November 21, 2012 at 10:00 a.m
This request includes, but is not limited to, the following:
SHORING AND BRACING, TRAFFIC CONTROL, CATHODIC PROTECTION SYSTEM, HORIZONTAL DIRECTIONAL DRILLING, BORE AND JACK, SLURRY SEAL, ELECTRICAL, MATERIAL SUPPLIES INCLUDING AGGREGATE, ASPHALT AND PIPE, AND TRUCKING
Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Bid documents may be obtained for from the County of Sonoma Water Agency’s website www.sonomacountywater.org. Plans may also be downloaded through the Small Business Development Centers at www.sba.gov/localresources/district/ca/index.html, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services.
Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Info: Mr. Steve Hanak (707/585-1221 or steveh@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**
Ghilotti Construction Company, Inc.
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Annette Conley
annette@ghilotti.com |