
License# 644515
An Equal Opportunity Employer
Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:
Agency: Caltrans
Caltrans Contract No. 04-4S5904
Project Name: Hwy 84 in San Mateo County
Project Description: Ghilotti Construction Company, Inc. is seeking certified UDBE subcontractors and suppliers for construction on state highway. Construct tieback in San Mateo County in Woodside at 0.6 mile north of Route 280/84 separation. (04-SM-84-22.1).
Engineer's Estimate: $1,610,000.00
UDBE Goal: 11%
370 WD & $3,000.00 per day LD
Submit quotes by NOON on bid date.
Contact estimator for more information.
GCC is available to discuss breaking out any portion of work to encourage UDBE participation.
Location: San Mateo County, CA
Bid Date: March 27, 2012 at 2:00 pm
This request includes, but is not limited to, the following:
CONSTRUCTION SITE MANAGEMENT, STREET SWEEPING, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGNS, COLD PLANE ASPHALT CONCRETE, CLEARING AND GRUBBING, HIGHWAY PLANTING, EROSION CONTROL, IRRIGATION SYSTEM, STEEL SOLDIER PILE, 30” DRILLED HOLE, STRUCTURAL CONCRETE RETAINING WALL, BAR REINFORCING STEEL, CLEAN & PAINT STEEL SOLDIER PILING, PREPARE AND STAIN CONCRETE, METAL BEAM GUARD RAILING, STRIPING & MARKING AND TRUCKING.
Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Bid Documents may also be viewed and downloaded on Caltrans website using the following link: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php. Plans may also be downloaded through the Small Business Development Centers at www.sba.gov/localresources/district/ca/index.html, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Info: Mr. Nick Keane (707/585-1221 or nickk@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**
Ghilotti Construction Company, Inc.
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Annette Conley
annette@ghilotti.com |