
License# 644515
An Equal Opportunity Employer
Is requesting quotations from all qualified DBE subcontractors and material suppliers for the following project:
Agency: Caltrans
Project #: 04-2908E4
Project Name: Hwy 580 in Alameda County
Project Description: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors and suppliers for construction on state Highway 580. Roadway widening and rehabilitation Alameda County in Livermore, Pleasanton and Dublin (04-Ala-580-14.6/21.6).
Engineers Estimate: $50,200,000.00
DBE Goal: 8%
485 WD & $24,500.00 per day LD
Submit quotes by NOON on bid date.
GCC is available to discuss breaking out any portion of work to encourage minority participation.
Location: Alameda County, CA
Bid Date: August 29, 2012 at 2:00 pm
This request includes, but is not limited to, the following:
TEMP FENCE (ESA, WIDELIFE, SILT), STREET SWEEPING, CONSTRUCTION AREA SIGNS, REMOVE STRIPING, TEMP K RAIL, REMOVE CHAIN LINK FENCE, REMOVE DOUBLE THRIE BEAM BARRIER, REMOVE PORTLAND CEMENT CONCRETE PAVEMENT, ROADSIDE SIGN, RELOCATE SIGN STRUCTURE, COLD PLANE AC PAVEMENT, REMOVE BRIDGE, CLEAR & GRUB, SOIL NAIL ASSEMBLY, HIGHWAY PLANTING, EROSION CONTROL, ROLLED EROSION CONTROL, MAINTAIN EXISTING IRRIGATION, LIME, LIME STABILIZED SOIL, ASPHALTIC EMULSION, LEAN CONCRETE BASE, PAVING ASPHALT, GEOSYNTHETIC PAVEMENT INTERLAYER, TACK COAT, INDIVIDUAL SLAB REPLACEMENT, JOINTED PLAIN CONCRETE PAVEMENT, SEAL PAVEMENT JOINT, SEAL LONGITUDINAL ISOLATION JOINT, DOWEL BAR RETROFIT, PRESTRESSED CONCRETE PILINGS, DRIVE PILE, STRUCTUREAL CONCRETE BRIDGE, CONCRETE RETAINING WALL, MINOR CONCRETE, FRACTURED RIB TEXTURE, DRILL AND BOND DOWEL, FURNISH CONCRETE GIRDER, ERECT GIRDER, REFINISH BRIDGE DECK, JOINT SEAL, BAR REINFORCING STEEL, SHOTCRETE, SIGN STRUCTURE (TRUSS), INSTALL SIGN STRUCTURE, FURNISH FORMED PANEL SIGN, CAST IN DRILLED HOLE CONCRETE PILE (SIGN FOUNDATION), INSTALL SIGN, MISC. IRON AND STEEL, CHAIN LINK FENCE, METAL BEAM GUARD RAIL, CONCRETE BARRIER, STRIPING & MARKING, MAINTAIN TRAFFIC MANAGEMENT SYSTEM DURING CONSTRUCTION, LIGHTING & SIGN ILLUMINATION, WIRELESS MAGNETOMETER VEHICLE DETECTION STATION, TRAFFIC MONITORING STATION, CLOSED CIRCUIT TV, CAMERA UNIT, VIDEO ENCODER UNIT, WIRELESS MODEM RADIO SYSTEM, RAMP METERING SYSTEM AND TRUCKING
Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Bid Documents may also be viewed and downloaded on Caltrans website using the following link: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php. Plans may also be downloaded through the Small Business Development Centers at www.sba.gov/localresources/district/ca/index.html, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Info: Mr. Mark Mahboubi (707/585-1221 or markm@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**
Ghilotti Construction Company, Inc.
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Annette Conley
annette@ghilotti.com |