
L. H. WOODS & SONS, INC.
REQUEST FOR QUALIFIED DBE
ACCEPTABLE CERTIFICATIONS: DOT, SBA, EPA (or Tribal, State and Local Governments Meeting EPA Requirements)
SUBCONTRACTORS AND SUPPLIERS FOR:
930 ZONE RECYCLED WATER PIPELINE, IEUA PROJECT NO. EN13023.00
BID DATE: 1/31/13
QUOTES DUE BY: 1/30/13
The project consists of all activities necessary to construct approx. 12,536 LF of 30-inch pipeline including appurtenances, laterals and pressure reducing station via open cut and trenchless methods Location: Vicinity of Chino/Chino Hills, CA
L. H. Woods & Sons, Inc., is accepting quotes for the following work (including but not limited to): Welding, Rebar, Structural Concrete, Paving, dewatering, cathodic, trucking, traffic control, jack/bore/tunneling, shoring design, shoring supplies, survey, striping, traffic signals/loops, and SWPPP.
Contact Teresa Woods
@ L.H. WOODS & SONS, INC.
An Equal Opportunity Employer (EOE)
2115 La Mirada Drive
Vista, CA 92081
Phone (760) 599-5500; Fax (760) 599-5510
Performance and payment bonds may be required. Assistance to DBE subcontractors/suppliers in obtaining bonds, lines of credit, and/or insurance is available from LHWS. Assistance to DBE firms is available from LHWS in obtaining necessary equipment, supplies, or materials. LHWS is willing to work with qualified DBE firms to establish acceptable delivery schedules, when work requirements permit. We encourage submittal of DBE subcontractor consortium quotes. Plans and specifications and contract information are available at no cost for review in our office between the hours of 8:00 a.m. and 4:00 p.m. M-F or through The Network web: http://www.govbids.com/scripts/TheNetwork/member/login/Default.asp. Subcontractors will be required to abide by the terms of the AGC Master Labor Agreements and to execute an agreement utilizing the latest L. H. Woods & Sons, Inc. Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. L. H. Woods & Sons’ listing of a subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. L. H. Woods & Sons requires that Subcontractors and suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.
Equal Opportunity Employer (EOE) |