Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

Advertisement date December 7th, 2012 through bid opening date

Ghilotti Construction

License# 644515

An Equal Opportunity Employer

Is requesting quotations from all qualified DBE subcontractors and material suppliers for the following project:

Agency: County of Sonoma

County Project No. C00028 - Federal Aid Project No. BRLS – 5920 (045)

Project Name: Porter Creek Road Bridge Replacement Project

Project Description: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors and suppliers for the Porter Creek Road Bridge Replacement Project in Sonoma County, CA. The work consists of replacing the existing bridge at Porter Creek with a 62-foot-wide by 160-foot-long single span concrete box girder bridge, along with widening of the approach roadways and construction of a left turn lane at Franz Valley Road.

Engineer's Estimate: $4,000,000.00

DBE Goal: 6.97 %

365 WD and $3000.00 per day LD

 

Submit quotes by NOON on bid date.

Contact our estimator for more information or assistance.

 

GCC is available to discuss breaking out any portion of work to encourage minority participation.

 

Location: Sonoma County

 

 

Bid Date: January 17, 2013 at 2:00 p.m.

This request includes, but is not limited to, the following:

TRAFFIC CONTROL SYSTEM, TEMP K RAIL, REMOVE FENCE, REMOVE MBGR, COLD PLANE AC PAVEMENT, CLEAR & GRUB, REMOVE TREE, ESA FENCE, STRUCTURAL CONCRETE (RETAINING WALL), SOUND WALL (WOOD TOP), ARCHITECTURAL SURFACE (CONCRETE BARRIER), BAR REINFORCING STEEL (RETAINING WALL), PREPARE AND PAINT CONCRETE, CONCRETE (DITCH LINING), MBGR, TUBULAR HANDRAILING, 24” CAST-IN-DRILLED HOLE CONCRETE PILING, PRESTRESSING CAST-IN-PLACE CONCRETE, STRUCTURAL CONCRETE (BRIDGE, BRIDGE FOOTING), STRUCTURAL CONCRETE APPROACH SLAB (TYPE EQ), JOINT SEAL (TYPE B – MR 1”), BAR REINFORCING STEEL (BRIDGE) AND TRUCKING

Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Bid Documents are available from the Sonoma County Department of Transportation and Public Works, 2300 County Center Drive, Suite B100, Santa Rosa, CA 95403. Plans may also be downloaded through the Small Business Development Centers at www.sba.gov/localresources/district/ca/index.html, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services.

Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

 

Info: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108.  G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR.  Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)

Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.

Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.

**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**

 

Ghilotti Construction Company, Inc.

246 Ghilotti Ave

Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601

Contact: Annette Conley

annette@ghilotti.com

Published on December 7th, 2012 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME