
License # 467088
6 Cushing Way, Suite 200
Irvine, CA 92618
(949) 753-1414 OFFICE
(949) 753-1477 FAX
ORTIZ ENTERPRISES, INC. is bidding on the following project as Prime Contractor. This project has a 10% SBE participation requirement. We invite and encourage SBE and DBE subcontractors to submit sub-bids on this project:
Project Description: Baldwin Avenue Grade Separation
Project Location: El Monte, CA
Owner: Alameda Corridor-East (ACE) Construction Authority
Project No: 12-04
Bid Date: Wednesday, September 5, 2012 at 2:00PM
SUB - BIDS FOR THE FOLLOWING TRADES:
Aggregates (Furn), Archaeological, Asphalt Paving, Bearing Pads (Furn), Clearing, Clearing & Grubbing, Concrete (Furn) Construction Area Signs, Corrugated Pipe (Furn), Demolition, Drainage, Electrical, Erosion, Fence, Form Liners (Furn), Geo Tech Test/Inspect, Hazardous Material, Jacking Boring, Landscape/Erosion Control, Lined Ditch (Concrete), Masonary/Soundwall, Minor Concrete, Minor Conc Stamped, Minor Struc conc, Misc Metal (Drain), Piling, Pile Driving, Pile Driving, Plastic Pipe (Furn), PreCast Conc, Pump Sta (Complete), Railroad work, Rebar, Reinforced Conc Pipe (Furn) Roadside signs, Shoring, Surveying, Swppp plans, Thermoplastic Striping/Marking, Traffic Marking, Trucking, Underground, Waterproofing, Water Line Mat’l, Pump Station-Subs/Materials; Cranes (overhead), Doors/windows/panels, Electrical, Engines, Flap Gates, Generators, Mechanical Supplier, Mechanical Contractor, Misc Metal (Inc Stainless), Piping-Fabricated, Propane-Tanks/Vaporizers, Pumps, Roofing, Ventilation, Vibration Monitoring.
Plans and Specifications are available for viewing at Ortiz – please call to arrange. You may also view and/or download plans at our FTP site: www.ortizplans.com username: 12-036, password: Ortiz. Please check the site for updates. Addenda will be posted to the site when received from Owner. It is your responsibility to make sure you have the most current information.
If you have any questions contact John Schaar or Mike Bashaw at (949) 753-1414 or oei@ortizent.com.
Ortiz Enterprises Inc. is an equal opportunity employer
Subcontractors are required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by Ortiz. Ortiz will pay bond premium up to 1.5%. Prime bidder can provide subcontractor a list of firms and/or agencies that will assist in bonding, lines of credit, etc. Workers Compensation Waiver of Subrogation will be required. Ortiz Enterprises Inc. is a Union Signatory Contractor. Subcontractors will be required to sign Ortiz Enterprises Inc. Standard Subcontract Agreement. |