
License# 644515
An Equal Opportunity Employer
Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:
Agency: Caltrans
Project Name: Placement of HMA Overlay& Reconstruct Metal Beam Guardrail
Contract No. 01-3994U4
Project Description: Ghilotti Construction Company, Inc. is seeking UDBE subcontractors and suppliers for placement of HMA overlay and reconstruction of Metal Beam Guardrail in Lake and Mendocino Counties at various locations (01-Lak,Men-29-, 175-VAR).
Ghilotti Construction Company, Inc. is seeking UDBE subcontractors and suppliers for rubberized warm mix asphalt overlay work in Marin County (04-MRN-1-19.0/22.8).
Engineer's estimate: $15,900,000.00
130 WD and $8,300 per day LD
UDBE Goal: 5%
Submit quotes by NOON on bid date.
Contact our estimator for more information or assistance.
Location: Lake County, CA
Bid Date: May 24, 2011 at 2:00 PM
This request includes, but is not limited to, the following:
TEMP. FENCE, CONSTRUCTION SITE MANAGEMENT, TEMP MULCH, TEMP FIBER ROLL, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, REMOVE & RECONSTRUCT MBGR, COLD PLANE ASPHALT CONCRETE PAVEMENT, WEED CONTROL MAT (FIBER), CRACK TREATMENT, CENTERLINE & SHOULDER RUMBLE STRIP, ASPHALT DIKE, TACK COAT, STRIPING & MARKING, MAINTAIN EXISTING TRAFFIC MANAGEMENT SYSTEM, DETECTOR LOOPS, PIEZO AND TRUCKING
Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Bid Documents may also be viewed and downloaded on Caltrans website using the following link: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php. Plans may also be downloaded through the Small Business Development Centers at www.sba.gov/localresources/district/ca/index.html, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Info: Mr. Dan Palmer (707/585-1221 or danp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**
Ghilotti Construction Company, Inc.
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Annette Conley
annette@ghilotti.com |