
License# 644515
An Equal Opportunity Employer
Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:
Agency: Caltrans
Project Name: Drainage System Rehabilitation
Project #: 04-4S5404
Project Description: Ghilotti Construction Company, Inc. is seeking certified UDBE subcontractors and suppliers for construction on state highway in Marin County Near Stinson Beach from 2.2 mile north of Calle Del Arroyo to Bolinas Road (04-MRN-1-15.0/17.0.
Engineer's Estimate: $2,050,000.00
100 WD & $3,000.00 per day LD
UDBE Goal: 6%
Submit quotes by Noon on bid date.
Contact estimator for more information.
Location: Stinson Beach, CA
Bid Date: APRIL 20, 2011 at 2:00 PM
This request includes, but is not limited to, the following:
TEMPORARY REINFORCED SILT FENCE, CONSTRUCTION SITE MANAGEMENT, PREPARE SWPPP, TEMPORARY GRAVEL BERM BAG, CONSTRUCTION ENTRANCE & DRAINAGE INLET PROTECTION, STREET SWEEPING, CAS, TRAFFIC CONTROL SYSTEM, TEMPORARY DELINEATOR, PORTABLE CHANGEABLE MESSAGE SIGN, REMOVE/INSTALL THERMOPLASTIC TRAFFIC STRIPES, COLD PLANE AC, LEAD COMPLIANCE PLAN, FIBER ROLLS, EROSION CONTROL, ASPHALTIC EMULSION MEMBRANE, LIQUID ASPHALT (PRIME COAT), TACK COAT, PAVEMENT MARKINGS AND TRUCKING
Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be viewed and downloaded on Caltrans website using the following link: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Info: Mr. Nick Keane (415/256 – 1525 or nickk@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required.
**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**
Ghilotti Construction Company, Inc.
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Annette Conley
annette@ghilotti.com |