Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: January 4th, 2011 through bid opening date

SEMA Construction

6 Orchard, Ste. 150
Lake Forest, CA 92630
Phone: 949-470-0500
Fax: 949-829-0100

Bid Information:

OWNER:                     California Dept. of Transportation (Caltrans)  

BID DATE:                  Thursday, January 13, 2011 @ 2:00 PM             

LOCATION:               Construct on State Highway in Riverside County in Moreno Valley on

                                      Route 215 From 0.9 KM North of Eucalyptus Ave Undercrossing to 0.5

                                      KM West of Box Springs Road Overcrossing and on Rte 60 from 60/215

                                      Separation to 0.4 KM East of Day Street Overcrossing
CONTRACT NO:       08-449314

 

       SEMA Construction, Inc. is requesting sub bids and material quotes from UDBE subcontractors and suppliers to meet the 3% goal for minority participation. Subcontractors will be required to comply with the various Labor Agreements in the respective trade unions. Contract retention will be withheld and/or paid in accordance with applicable Owner’s contract provisions. Please include price of Payment & Performance Bonds, at 100%, in your quote. Please allow for prices to be held for a minimum of 60 days from the date of Notice of Ward.

 Plans & specs can be viewed and downloaded at: http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/08/08-449314/

 


Submit quotes to:

       SEMA Construction, Inc., Attn:  Estimating Dept., 6 Orchard, Ste. 150, Lake Forest, CA  92630, phone 949-470-0500 or fax 949-829-0100; Direct Technical Questions To: Armando Cisneros or Tony Mendez  949-470-0500; fax 949-829-0100.

Qualified UDBE/DBE firms are encouraged to participate.  Bonding, LOC, and special insurance limits may be required; please contact SEMA for assistance.  We will assist with any technical information relating to plans, specs and requirements for work being provided.  Where needed, SEMA will help with obtaining necessary equipment, supplies, materials, or related assistance and/or services. EOE.

Remarks - Items Required include but are not limited to: AC-Prime Coat/Tack Coat/Cold Planing/Dike/HMA/Paving/Slope, Base – Aggregate/Subbase, Lean Concrete Base, Fractured Rib Texture, Asphalt Emulsion, Bridge Removal, CIDH Conc Piling, Clear & Grub, Concrete & Cement, Concrete – Barrier/Core/Paving/Slope/Structure/Minor, Demo, Dev. Water Supply, Double Thrie Beam Barrier, Drainage – Bridge Deck/Other, Drill & Bond Dowel, Electrical, Erosion Control, Fencing, Filter Fabric, Imported Borrow, Irrigation System, Joint Seal Assembly, Lead Compliance Plan, Polyester Concrete Expansion Dam, Asphalt Concrete Vegetation Control, Refinish Bridge Deck, Conc Flared End Section, MBGR w/Wd Post, Misc Steel and Iron, Delineators/Object Markers, Pavement Markers – Paint/TP, Pipe – Jacked RCP/RCP/WSP Casing/Alternative Culvert, Electrical, Ramp Metering, Signal & Lighting, Vehicle Detection, PC Conc Pipe Inlet, Rock Blanket, P&C Embankment, PC/PS Conc Girders, PS CIP Concrete, Railing – K/Cable/WB/CL/Tubular, Rebar, Soil Binder, Portable Changeable Msg Sign, Sign Structures, Construction Area & Rdwy Signs, PC Conc Pipe Manhole, Rock Slope Protection, Street Sweeping, SWPPP, Terminal System, Tie Back Anchor, Traffic Control 

 

Published on January 4th, 2011 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME