Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: April 19th, 2011 through bid opening date

Granite Construction Company

An Equal Opportunity Employer

Is requesting sub-bids from qualified UDBE Subcontractors and Suppliers for the following project:

City of El Paso De Robles

State Highway In San Luis Obispo County In El Paso De Robles At Spring Street On-Ramp On Route 101 From 0.1 Mile South Of 13th St. Overcrossing To Route 46 From Route 101/46 Separation And On Route 46 From Route 101/46 Separation

PROJECT NO: DPW 06-01A

 

 BID DATE:  MAY 19, 2011             BID TIME:   2:00 PM

Granite Construction Company (Granite) requests subquotes from all qualified subcontractors and suppliers including certified UDBE firms performing commercially useful function for the following items of work, including but not limited to: Progress Schedule (Critical Path Method), Temporary Fence (Type ESA), Construction Site Management Per Appendix D, Prepare Storm Water Pollution Prevention Plan, Non-Storm Water Management Per Appendix D, Wind Erosion Control Per Appendix D, Sediment Control Per Appendix D, Run-On And Run-Off Controls Per Appendix D, Rain Event Action Plan Per Appendix D, Monitoring, Analysis And Reporting Per Construction General Permit And Appendix D, Temporary Construction Entrance, Temporary Check Dam, Temporary Drainage Inlet Protection, Street Sweeping, Temporary Concrete Washout (Portable), Construction Area Signs, Traffic Control System, Traffic Control Management And Detour Plan, Contingency Plan And Re-Opening Of Closures, Type III Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Temporary Pavement Marker, Portable Changeable Message Sign, Temporary Railing (Type K), Crash Cushion Module, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Abandon Inlet, Abandon Pipeline, Removals: Fence, Chain Link Fence, MBGR, Painted Traffic Stripe, Painted Pavement Marking, Thermoplastic Stripe & Pavement Marking, Roadside Sign, Pipe, Inlet, Concrete Box, Base And Surfacing, Grate, Salvage Metal Bridge Railing, Reconstruct Chain Link Gate, Relocate Guard House, Relocate Dumpster And Fence Enclosure, Relocate Roadside Sign, Adjust Fire Hydrant To Grade, Cold Plane Asphalt Concrete, Remove Concrete Box, Adjust Frame And Cover To Grade, Cap Pipe, Bridge Removal (Portion), Clearing And Grubbing, Trim Tree And Roots, Tree Removal, Roadway Excavation, Roadway Excavation (Type Z-2) (Aerial Deposited Lead), Lead Compliance Plan, Structure Excavation (Retaining Wall), Structure Backfill (Retaining Wall), Highway Planting, Prepare Trench, Duff (Remain On Site), Fiber Roll, Compost (Incorporate), Move-In/Move-Out (Erosion Control) (Biosfiltrationwale Hydroseeding), Move-In/Move-Out (Erosion Control) (Wildflower Seeding), Erosion Control (Hydroseed) (Biosfiltrationwale), Rolled Erosion Control Product (Blanket), Wild Flower Seeding, Maintain Existing Planted Area (1 Year), Plant Establishment Work (3 Years), Maintain Existing Irrigation Facilities (12 Months), Irrigation System, Install 1.5" Meter And Box, Install 1" Meter And Box, 10" Corrugated High Density Polyethylene Pipe Conduit, Extend 10" Conduit, Temporary Irrigation For Mitigation Oaks (3 Years), Class 2 Aggregate Base, Lean Concrete Base, Slurry Seal, Hot Mix Asphalt (Type A), Hot Mix Asphalt (Open Graded), Rumble Strip, Data Cores, Place Hot Mix Asphalt Dike, Liquid Asphalt (Prime Coat), Asphaltic Emulsion (Paint Binder), Structural Concrete, Retaining Wall, Minor Concrete (Minor Structure), Heavy Blast Texture, Refinish Bridge Deck, Concrete Anchor Block, Bar Reinforcing Steel (Retaining Wall), Furnish Sign Structure (Truss), Install Sign Structure (Truss), Furnish Formed Panel Sign (Overhead), 60" CIDH Concrete Pile (Sign Foundation), Roadside Sign- One Post, Two Post, Install Sign Panel On Existing Structure, 8" PVC Pipe, 18" CHDPE (Type S), 24" CHDPE (Type S), 12" Reinforced Concrete Pipe, 8" Perforated Steel Pipe Underdrain, Drainage Inlet Marker, 18" Steel Flared End Section, Drainage Manhole, 36" Precast Concrete Pipe Inlet, Minor Concrete (Pipe Encasement), Slope Paving (Concrete), Minor Concrete (Curb), Minor Concrete (Curb And Gutter), Minor Concrete (Curb And Sidewalk), Minor Concrete (Stamped Concrete), Minor Concrete (Curb Ramp), Miscellaneous Iron And Steel, Chain Link Fence (Type CL-6), Chain Link Fence (Type CL-10) (Extension Arm), 4-Ft Chain Link Fence (Type CL-6), 4-Ft Ornamental Picket Railing (Type A) Gate, 6-Ft Chain Link Gate (Type CL-6), 10-Ft Chain Link Gate (Type CL-10) (Extension Arms), Survey Monument, Delineator (Class 1), Object Marker, Metal Beam Guard Railing (Steel Post), Ornamental Picket Railing (Type A), Ornamental Railing, Concrete Barrier (Type 26 Modified), Transition Railing (Type WB), Alternative Flared Terminal System, Concrete Barrier (Type 60GC), 4" Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Paint Traffic Stripe (2-Coat), Pavement Marker (Non-Reflective), Pavement Marker (Retroreflective), Maintain Of Existing TMS Elements During Construction, Signal And Lighting (Location 1), City Lighting (Riverside) Per Sheet E-18 And Appendix E, City Lighting At 13th Street Bridge Barrier, Lighting And Sign Illumination, Ramp Meter.

** ALL SCHEDULE OF BID ITEMS OPEN FOR BID **

Including items of work normally performed by Granite.

Quotations will be broken down into comparable packages as reasonably necessary.  Granite will work with interested UDBE subcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%.  Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Granite’s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator.

Plans and specifications are available for viewing at our office located at:  5335 Debbie Lane Santa Barbara, CA 93111

Please call if you need any bidding assistance including but not limited to;  obtaining bonding, insurance, equipment, materials and/or supplies.

Granite intends to work cooperatively with all qualified UDBE firms seeking work on this project.

Granite Construction Company

P.O. Box 6744
Santa Barbara, California 93160
Phone (805) 964-9951

Fax (805) 967-1431

Contact: JESSIE BISHOP

jesse.bishop@gcinc.com

Published on April 19th, 2011 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME