Is requesting quotations from all qualified UDBE / DBE subcontractors and material suppliers for the following project:
Agency: City of Daly City
Project Name: Junipero Serra Blvd, Hoffman St, & San Pedro Rd Rehabilitation
Federal Project # STPL-5196 (035)
Project Description: Ghilotti Construction Company, Inc. is seeking certified UDBE/DBE subcontractors and suppliers for asphalt concrete repairs and overlay, concrete curb, gutter, cub ramps, utility manhole an box adjustment and replacement, traffic detector cameras and traffic loops on various streets in the City of Daly City, CA.
Engineer's Estimate: $1,242,000.00
30 CD and $1,000.00 per day LD
UDBE Goal: 5% / DBE Goal: 12.5%
Submit quotes by NOON on bid date.
Contact our estimator for more information or assistance.
Location: San Mateo County, CA
Bid Date: APRIL 14, 2011 at 2:00 PM
This request includes, but is not limited to, the following:
COLD PLANING AC, CONCRETE, ADJUST MANHOLE, WATER VALVE, UTILITY BOX, MONUMENT & TRAFFIC SIGNAL POLE, SIGN POLE, VIDEO DETECTOR, REPLACE TRAFFIC LOOP, STRIPING, MARKING AND TRUCKING
Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Copies of the contract documents are available for $40 a set if picked up & $50 a set if mailed, from the Daly City Public Works Department/Engineering Division, 333-90th Street, Daly City, CA 94015, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Info: Mr. Thomas Smith is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required.
**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**