
Sim J. Harris, Inc., a union contractor, invites you to bid on the project described below. Plans are available for your use in our office or online at http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php
Please refer your responses and questions to Terri at (858) 437-0190.
Agency/Owner: CALTRANS
Project: RTE 58 IN SAN BERNARDINO COUNTY NEAR KRAMER FROM E/O KERN COUNTY TO E/O 58/395 SEPARATION
Project No.: 08-0E8504
Bid Date: NOV. 18, 2010 2:00 PM Bid By: 11/18/10 NOON
Quotes are requested for: Temporary fence (Desert Tortoise), SWPPP, construction area signs, traffic control system, channelizer (surface mounted), flashing beacon (portable), PCMS, temporary K-rail, temporary crash cushion modules, biologist (LS), cold plane, clear & grub, develop water supply, lead compliance plan, slurry cement structure backfill, erosion control, transplant Joshua tree, rumble strip, data core, liquid asphalt, minor concrete structure, permanent fence (Desert Tortoise), wire mesh gate, survey monuments, striping & marking, maintain existing traffic management system elements, modify sign illumination, modify traffic monitoring station, trucking, asphalt materials, aggregate base.
Sim J. Harris, Inc., a union contractor, is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors, or vendors regardless of age, race, color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disabled veteran, or Vietnam era veteran status. We can assist you in advice on obtaining bonding, insurance, or credit lines for this project.
Note: A Waiver of Subrogation will be required. Subcontractor may be required to provide a 100% payment/performance bond for the value of your work. Please specify the cost of this bond separately on your quote. Caltrans and Sim J. Harris, Inc. have plans for you to review. Please call for appt. |