Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: November 1st, 2010 through bid opening date

Ghilotti Construction

License# 644515

An Equal Opportunity Employer

Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:

Agency: San Francisco Bay Area Rapid Transit (BART)

Contract No.: 15PC-110

Project Name: BART Earthquake Safety Program Aerial Structures - A Line South

Project Description: Ghilotti Construction Company, Inc. is seeking certified UDBE subcontractors and suppliers for structural modifications of existing elements of the BART system to provide adequate resistance to forces of a major seismic event, including shoring for excavation support, clear & grub, drilling & bonding dowels in concrete, removal & replacement of pavement, curb, gutter, sidewalk & surface features including landscaping.

Engineer's Estimate:   $15 - 23 Million

UDBE Goal: 5 %

 

Submit quotes by NOON on bid date

 

Location: Various Cities, Alameda County, CA

Bid Date: November 30th, 2010 at 2:00 PM

This request includes, but is not limited to, the following:

Landscape Survey, Demolition, Selective Structure Demolition, Prestressed Concrete, Concrete Reinforcing, Drill & Pressure Grout High-Strength Rods, Frp Column Casings, Structural Steel Framing, Steel Column Casings, Isolation Column Casings, Excavation Support And Protection (Uprr), Drilled Concrete Piers And Shafts (Cidh) At 24-In Dia., Concrete Curbs, Gutters, Walks, Pavement Markings, Signage, Traffic Barriers, Chain Link Fencing & Gates, Planting Irrigation, Sodding, Horse Shoe Pit And Trucking

Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also viewed / purchased SF BART at 300 Lakeside Drive, 23rd Floor, Oakland, CA or by calling 510/464-7546, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Mr. Nick Keane, is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance.

(Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108.  G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR.  Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) 

 

Ghilotti Construction Company, Inc.

246 Ghilotti Ave

Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601

Contact: Annette Conley

annette@ghilotti.com

Published on November 1st, 2010 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME