Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: May 21st, 2010 through bid opening date

Ghilotti Construction

License# 644515

An Equal Opportunity Employer

Is requesting quotations from all qualified

ACTIA CERTIFIED LBE/SLBE/VSLBE

subcontractors and material suppliers for the following project:

Agency: City of Hayward

Project #: 5117

Project Name: Route 238 Corridor Improvements, Industrial Parkway to Apple Avenue

Project Description: The work description is: pavement widening and rehabilitation, construction of concrete curb and gutter, sidewalk, medians, bridge rail replacement, traffic signals, traffic signal bridges, traffic striping and roadway signs, street and pedestrian lighting, joint trench conduits and vaults, catch basins and storm drains, water lines, landscaping and trucking for work on Mission Blvd., Foothill Blvd., D Street and A Street.

Engineer's Estimate: $59,600,000.00

600 WD and $9,900.00 per day LD

LBE Goal: 60% / SLBE/VSLBE Goals: 20%

 

Submit quotes by 12:00pm on bid day

Contact our estimating department for more information (707-585-1221).

 

Bid Date: June 22nd, 2010 at 2:00 PM

This request includes, but is not limited to, the following:

WATER POLLUTION CONTROL, CONSTRUCTION PROJECT INFORMATION SIGNS, CAS, TRAFIC MANAGEMENT PLAN, TRAFFIC CONTROL SYSTEM, SITE FURNISHINGS (BUS SHELTER, NEWS STAND, BENCH, BIKE RACK), MINOR CONCRETE, BRIDGE WORK INCLUDING PRECAST COLUMNS, UNDERGROUND INLCUDING STORM DRAINS AND CATCH BASINS, STRUCTURAL CONCRETE WORK, ARCHITECHTURAL CONCRETE WORK, PAVERS, FENCING, SIGNS, STRIPING & PAVEMENT MARKINGS, ELECTRICAL INCLUDING TRAFFIC SIGNALS, LIGHTING AND CONDUITS, JOINT TRENCH EXCAVATION AND BACKFILL, LANDSCAPING, COLD PLANE AC, CLEAR AND GRUB, IRRIGATION, AND TRUCKING

 

Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be obtained through the City of Hayward @ 777 'B' Street, Hayward, CA 94541 (510) 583-4738 for $100 per set, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

 

Mr. Jim Petnic is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance.

(Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractor will be required to sign a job agreement for trades covered under our agreements.)

 

Ghilotti Construction Company, Inc.

246 Ghilotti Ave

Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601

Contact: Annette Conley

annette@ghilotti.com

 

Published on May 21st, 2010 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME