
License# 644515
An Equal Opportunity Employer
Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:
Agency: Caltrans
Project #: 04-3A3004 (04-Sol-80-38.3/44.7)
Project Name: Construction on State Highway 80
Project Description: Construction on State Highway in Solano County, road resurfacing and approach slab replacement.
Engineer's Estimate: $13,800,000.00
210 WD and $8,300.00 per day LD
UDBE Goal: 6%
Submit quotes by 12:00pm on bid day
Contact our estimating department for more information (707-585-1221).
Bid Date: June 8th, 2010 at 2:00 PM
This request includes, but is not limited to, the following:
TEMPORARY FENCE, CONSTRUCTION SITE MANAGEMENT, SWPP, TEMP. FIBER ROLL, TEMP. DRAINAGE INLET PROTECTION, TEMP. CONCRETE WASHOUT (PORTABLE), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMP. PAVEMENT MARKING, TEMP. TRAFFIC STRIPE, TEMP PAVEMENT MARKER, PORTABLE CHANGEABLE MESSAGE SIGN, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE, REMOVE METAL BEAM GUARD RAILING, REMOVE PAVEMENT MARKER, RECONSTRUCT DOUBLE THRIE BEAM BARRIER, RECONSTRUCT METAL BEAM GUARD RAILING, COLD PLANE ASPHALT CONCRETE PAVEMENT, LEAD COMPLIANCE PLAN, DATA COR, TACK COAT, STRUCTURAL CONCRETE APPROACH SLAB, MINOR CONCRETE, JOINT SEAL, BONDED JOINT SEAL, OBJECT MARKER, VEGETATION CONTROL, TRANSITION RAILING, TERMINAL ANCHOR ASSEMBLY, ALTERNATIVE FLARED TERMINAL SYSTEM, THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, PAVEMENT MARKER, MAINTAIN EXISTING TRAFFIC MANAGEMENT, WIRELESS DETECTOR SYSTEM, AND TRUCKING.
Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be obtained through the Department of Transportation via their website at: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Mr. Dan Palmer is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance.
(Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractor will be required to sign a job agreement for trades covered under our agreements.)
Ghilotti Construction Company, Inc.
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Kameron Rankin
kameron@ghilotti.com
|