Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: July 27th, 2010 through bid opening date

Sim J Harris, inc.

Sim J. Harris, Inc. invites you to bid on the project described below.  Contract Documents may be obtained by visiting the City’s website and click on City projects on e-bidboard.  The website is:
 http://buynet.sdcounty.ca.gov/Solicitations/OpenSolicitations.aspx
Please refer your responses and questions to Terri Halverson at (858) 437-0190.

Agency/Owner:     COUNTY OF SAN DIEGO

Project:                 CAMPO ROAD INTERSECTION IMPROVEMENTS

Project No.:          RFB 4605

Bid Date:              AUGUST 19, 2010      2:00 PM         Bid By:      8/19/10 NOON

 

Quotes are requested for:      SWPPP, construction site management, temporary silt fence, fiber roll & gravel bag, temporary concrete washout facility, traffic control, roadside sign, project identification sign, clear & grub, structure excavation (retaining wall), structure backfill (retaining wall), pervious backfill material, erosion control (Type D), aggregate base material, asphalt material, place asphalt dike, structural concrete (retaining wall), retaining wall stem (masonry), storm drain structures, drainage ditch, 18” & 24” RCP pipe, PCC flatwork, stamped concrete, chain link fence, automatic gate, metal beam guard railing, striping & marking, traffic signal system, street lights, wet utilities, storm water sampling & analysis, rain event action plan, street survey monument, trucking

 

Sim J. Harris, Inc., a union contractor, is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors, or vendors regardless of age, race, color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disabled veteran, or Vietnam era veteran status. We can assist you in advice on obtaining bonding, insurance, or credit lines for this project.

Note: A Waiver of Subrogation will be required. Subcontractor may be required to provide a 100% payment/performance bond for the value of your work. Please specify the cost of this bond separately on your quote. Sim J. Harris, Inc. has plans in our office for you to review. Please call for appt.

Published on July 27th, 2010 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME