Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: February 2nd, 2010 through bid opening date

Granite Constuction Company

An Equal Opportunity Employer

Is requesting sub-bids from qualified UDBE Subcontractors and Suppliers for the following project:

COUNTY OF SAN LUIS OBISPO

WILLOW ROAD EXTENSION

NIPOMO CALIFORNIA

CONTRACT NO. 300129

FEDERAL CONTRACT NO. ESPL-5949(117)

 

BID DATE:  FEBRUARY 25, 2010  @ 3 PM

Granite Construction Company (Granite) requests subquotes from all qualified subcontractors and suppliers including certified UDBE, firms for the following items of work, including but not limited to:

Construction Trailer/Office, Traffic Control System, Temp K-rail, Temp Crash Cushions, Temp Access Path, SWPPP, Clear & Grub, Demolition, Cold Plane Asphalt, Roadway Excavation, HDPE, RCP, CMP, CMP Manhole & Inlets, Storm Drain Inlets, Manholes, Rock Slope Protection, Conc Flared End Section, Crushed Rock, Concrete Spillway, Fencing/Gates, Erosion Control, Fiber Rolls, Agg Base (Type A), Rubberized Hot Mix Asphalt Gap Graded (RHMA-G), Place Hot Mix Asphalt (Misc Areas), Hot Mix Asphalt Dike, Roadside Signs, Pavement Markings (Thermoplastic), Pavement Markers, Painted Traffic Striping, Gas Lines/Svcs, Steel Sleeves, Barricade, Lighting, Dip Water Main, PVC Water Main, Wedge Gate Valve Assembly, Fire Hydrant Assembly, Valve Assembly, Trucking.

 

** ALL SCHEDULE OF BID ITEMS OPEN FOR BID **

 

Including items of work normally performed by Granite

 

Quotations will be broken down into comparable packages as reasonably necessary.  Granite will work with interested UDBEsubcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%.  Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Granite’s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. 

Plans and specifications are available for viewing at our office located at:

5335 Debbie Lane
Santa Barbara, CA 93111

Please call if you need any bidding assistance including; obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. 

Granite Construction Company

P.O. Box 6744
Santa Barbara, California 93160
Phone (805) 964-9951

Fax (805) 967-1431

Contact:   BRIAN JOHNSEN

brian.johnsen@gcinc.com

Published on February 2nd, 2010 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME