Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date December 20th, 2010 through bid opening date

Ghilotti Construction

License# 644515

An Equal Opportunity Employer

Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:

Agency: City of Daly City

Federal Project No. CML-5196(030)/HP 21L-6014(011)

Project Name: Top of the Hill Improvements

Project Description: Ghilotti Construction Company, Inc. is seeking certified UDBE subcontractors / suppliers for work in Daly City. The work includes streetscape enhancements, transit plazas, custom structures, traffic signal upgrades, water system upgrades, traffic signing and striping

Engineer's Estimate: $3,600,000.00

UDBE Goal: 10.4%

270 CD and $1,500.00 per day LD

Submit quotes by NOON on bid date.

 

Location: Daly City, CA

 

Bid Date: January 11th, 2011 at 10:00 AM

This request includes, but is not limited to, the following:

TRAFFIC SIGNAL, PROJECT SIGNS, SAWCUT & REMOVE CONCRETE CURB, GUTTER, SIDEWALK & DRIVEWAY, ADJUST UTILITY BOXES, VAULTS AND MANHOLES TO GRADE, MEDIAN CURB & GUTTER, CONCRETE SIDEWALK, RAMPS, DRIVEWAYS & BUS SHELTER, BRICK BANDING, BRICK PAVERS, PEDESTRIAN LIGHTS, CONDUIT FOR PED LIGHTS, CONDUIT FOR TREE LIGHTING & IRRIGATION CONTROLLERS, IRRIGATION, TREES, TURF BLOCKS, CLEAR & GRUB, PERGOLA, LIGHTING, TRAFFIC STRIPING & SIGNS, TRAFFIC SIGNAL MODIFICATIONS AND TRUCKING.

Plans and specs are available for review at our Santa Rosa office, local plan rooms, builders exchanges, Dodge Scan or a GCC closer to your location. Plans and Specs may also be purchased from the City of Daly City, 333-90th Street, Daly City, CA 94015 for $75.00 per set. GCC encourages the use of minority and women subcontractors and suppliers. We are an equal opportunity employer.

Mr. Steve Hanak is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance.

(Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.

Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required.

**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**

Ghilotti Construction Company, Inc.

246 Ghilotti Ave

Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601

Contact: Annette Conley

annette@ghilotti.com

Published on December 20th, 2010 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME