
License# 644515
An Equal Opportunity Employer
Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:
Agency: Caltrans
Contract No.: 03-0F7004- - HWY 80
Project Name: Shoulders To Be Widened And Rumble Strips Added
Project Description: Work on state highway 80 in Yolo County in and near Davis from Richards Boulevard Overcrossing to 0.1 Mile west of Yolo Causeway
(03-Yol-80-0.2/5.7).
Engineer's Estimate: $5,200,000.00
100 WD and $5,400.00 per day LD
UDBE Goal: 5%
Submit quotes by NOON on bid date
Contact Dan Palmer with any questions or for assistance (707/585-1221 or danp@ghilotti.com).
Bid Date: November 10th, 2010 at 2:00 PM
This request includes, but is not limited to, the following:
PREPARE SWPPP, TEMPORARY FIBER ROLL, TEMPORARY CONCRETE WASHOUT FACILITY, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), STREET SWEEPING, CAS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE & PAVEMENT MARKER, PORTABLE CHANGEABLE MESSAGE SIGN, RECONSTRUCT THRIE BEAM BARRIER (STEEL POST), COLD PLANE AC PAVEMENT, LEAD COMPLIANCE PLAN, RUMBLE STRIP, TACK COAT, VEGETATION CONTROL (MINOR CONCRETE), THERMOPLASTIC TRAFFIC STRIPE, RETROREFLECTIVE PAVEMENT MARKER, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFY TRAFFIC OPERATION SYSTEM AND TRUCKING.
Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at http://www.dot.ca.gov/hq/esc/oe or through the Small Business Development Centers at www.sba.gov/localresources/district/ca/index.html, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Mr. Dan Palmer, is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance.
(Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Ghilotti Construction Company, Inc.
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Annette Conley
annette@ghilotti.com |