Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: Caltrans 06-0X0604
Project: Construction on State Highway In Fresno County At Various Locations From 1.3 Miles West Of Warthan Creek Overcrossing To 1.7 Miles West Of Firestone Avenue
Plans & Specs are available for review at our office or online at: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
Bids open January 9, 2024, at 2:00 PM
DBE Goal: 22% | Estimate: $8,100,000
Estimating Dept.
Email: estimating@papichconstruction.com
Description: Remove and replace culverts and cured in place pipeliner.
** Addendum 1 issued**
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Water Pollution Control Program, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Clearing And Grubbing (Ls), Ditch Excavation, Move-In/Move-Out (Erosion Control), Hydromulch, Hydroseed, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Tack Coat, (F) - Structural Concrete, Box Culvert, (F) - Structural Concrete, Headwall, (F) - Bar Reinforcing Steel, (F) - Bar Reinforcing Steel (Box Culvert), 24" Alternative Pipe Culvert, 30" Alternative Pipe Culvert, (F) - Concrete Backfill (Pipe Trench), 18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe Trenchless Installation Method, 30" Reinforced Concrete Pipe, 36" Reinforced Concrete Pipe, 42" Reinforced Concrete Pipe, 60" Reinforced Concrete Pipe, 30" Reinforced Concrete Pipe Trenchless Installation Method, 24" Corrugated Steel Pipe (.138" Thick), 30" Corrugated Steel Pipe (.138" Thick), 36" Corrugated Steel Pipe (.168" Thick), 24" Corrugated Steel Pipe Downdrain (.079" Thick), 24" Anchor Assembly, 36" Corrugated Steel Pipe Inlet (.168" Thick), 18" Steel Flared End Section, 24" Steel Flared End Section, 30" Steel Flared End Section, 48" Steel Flared End Section, 18" Concrete Flared End Section, 24" Concrete Flared End Section, 30" Concrete Flared End Section, 36" Concrete Flared End Section, 42" Concrete Flared End Section, 36" Precast Concrete Pipe Inlet, Abandon Culvert (Lf), Remove Downdrain (Ea), Remove Inlet, Remove Headwall, Remove Flared End Section (Ea), Cleaning, Inspecting, And Preparing Culvert (Lf), Culvert Contact Grouting, Concrete Invert Paving, Sand Backfill, 18" Cured-In-Place Pipeliner, 24" Cured-In-Place Pipeliner, 30" Cured-In-Place Pipeliner, 48" Cured-In-Place Pipeliner, Rock Slope Protection (3/8 T, Class Vi, Method B) (Cy), Rock Slope Protection (1/4 T, Class V, Method B) (Cy), Rock Slope Protection (300 Lb, Class Iv, Method B) (Cy), Rock Slope Protection (150 Lb, Class Iii, Method B) (Cy), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection Fabric (Class 8), (F) - Miscellaneous Iron And Steel, Temporary Fence (Wildlife Exclusion California Tiger Salamander), Pavement Marker (Retroreflective), Object Marker, Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), (F) - Cable Railing, Alternative In-Line Terminal Tl-3, Remove Guardrail, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 18-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), Paint Traffic Stripe (1-Coat), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 6" Rumble Strip (Asphalt Concrete Pavement), Mobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.
Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |