Specialty Construction, Inc. Requests Sub-bids from All Qualified & Certified DBE Businesses Subcontractors/Suppliers for:
Project: Freedom County Sanitation District | Project No. P52636
Agency: Freedom Sewer Rehabilitation Project Phase 2
DBE Goal: 10%
Engineers Estimate: $5,800,000.
Bid Date: November 2, 2023, at 2:00 PM
NEW Bid Date: November 16, 2023, at 2:00 PM
The project location in the County of Santa Cruz, CA
Plans and Specs are available at the following link:
23-069 - Freedom Sewer Rehabilitation Ph 2, Santa Cruz Co
General work description: Work includes Rehabilitate sewer lines, replace and/or line existing manholes, replace frame and lids.
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Progress Schedule (Critical Path), Mobilization, Traffic Control Systems, Construction Area Signs, Job Site Management, Prepare Water Pollution Control Program, Temporary Construction Entrance (Type 1), Temporary High-Visibility Fence, Remove Asbestos Concrete Pipe (Nonhazardous Asbestos Waste), Slurry Seal, Gravity Main-Open Cut (8", Traffic Area), Gravity Main-Cipp (6"), Reconnect Lateral, Modify Lateral, Line Sewer Manhole (48' Diameter, Existing Manhole), Sewer Manhole (48' Diameter, Polymer Concrete), Inside Drop, Modify Sewer Manhole, Replace Manhole Frame And Cover (Cast Iron), Remove Sewer Cleanout Or Plug, Install Sewer Cleanout, Abandon Sewer Pipe (Plug Ends), Remove Sewer Manhole, Remove Outside Drop, Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Remove Thermoplastic Pavement Marking, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste) Asphalt Supplier, Concrete & Cement Supplier, Asphalt Concrete, Paving Asphalt (Asphalt Concrete)
Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested D/M/W/DV/LGBTBE/Section 3 Businesses firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price. SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate. For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents.
Specialty Construction, Inc.
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722