Advertisement date September 20, 2024 @ 4:22 p.m. through bid opening date

Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:

Agency: Caltrans No. 05-1J8604
Project: Construction on State Highway In San Luis Obispo County In And Near Arroyo Grande And Pismo Beach From Los Berros Road Undercrossing To Pismo Creek Bridge
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
DBE Goal: 22%
Bid Date: Thursday, November 7, 2024, at 2:00 PM
Engineers Estimate: $33,000,000.

General work description: Cold plane AC pavement, RHMA-G, drainage systems and barriers.

Estimating Dept.
Email: estimating@papichconstruction.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute- Resolution-Board-Related Tasks, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Flashing Arrow Sign, Type Iii Barricade, Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier System, Temporary Pedestrian Access Route, Portable Changeable Message Sign (Ls), End Of Queue Monitoring And Warning With Truck Mounted, Changeable Message Sign Day, Mobile Barrier System, Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Large Sediment Barrier, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Remove Concrete (Sqyd), Temporary High-Visibility Fence, Temporary Boundary Sign (On Post), Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Topsoil), Shoulder Backing, (F) - Structure Excavation (Bridge), (F) - Structure Backfill (Bridge), Roadside Clearing, Prune Existing Plants, Rock Blanket, Soil Amendment, Plant Tube, Plant (Group H), Plant Establishment Work (Minimum Bid), Temporary Irrigation System, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors, 1" Wye Strainer Assembly, Pop-Up Sprinkler Assembly (Gear Driven), Riser Sprinkler Assembly, 3" Gate Valve, (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Class 315) (Supply Line), (F) - 3" Plastic Pipe (Class 315) (Supply Line), (F) - Pvc Pipe Conduit (Sleeve), 12" Corrugated High Density Polyethylene Pipe Conduit, Move-In/Move-Out (Erosion Control), Imported Topsoil (Cy), Dry Seed (Sqft), Rolled Erosion Control Product (Netting), Fiber Rolls, Straw, Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Lean Concrete Base, Replace Asphalt Concrete Surfacing, Hot Mix Asphalt (Type A), Minor Hot Mix Asphalt, Rubberized Hot Mix Asphalt (Gap Graded), Hot Mix Asphalt (Bridge), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Grind Existing Bridge Deck, (F) - Structural Concrete, Bridge, Aggregate Base (Approach Slab), Structural Concrete, Approach Slab (Type R), (F) - Structural Concrete, Headwall, (F) - Structural Concrete, Drainage Inlet, Paving Notch Extension, Drill And Bond Dowel, Joint Seal (Mr 1/2"), (F) - Bar Reinforcing Steel (Bridge), Public Safety Plan, Rapid Setting Concrete (Patch), Repair Spalled Surface Area, Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, (F) - Place Polyester Concrete Overlay, (F) - Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Bridge Removal (Portion), Location A, Bridge Removal (Portion), Location B, Bridge Removal (Portion), Location C, 24" Hdpe, 18" Alternative Pipe Culvert, 24" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe Trenchless Installation Method, 18" Corrugated Steel Pipe (.109" Thick), 18" Steel Flared End Section, 18" Alternative Flared End Section, 24" Alternative Flared End Section, Abandon Culvert (Lf), Remove Culvert (Lf), Remove Inlet, Remove Headwall, Adjust Inlet, Cleaning, Inspecting, And Preparing Culvert (Lf), Culvert Slurry-Cement Backfill, Sand Backfill, Minor Concrete (Invert Paving), Rock Slope Protection Void Filler, Slope Paving (Exposed Aggregate), Gravel Filter, Rock Slope Protection (150 Lb, Class Iii, Method B) (Cy), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Curb) (Cy), Detectable Warning Surface, Minor Concrete (Curb And Gutter), Minor Concrete (Stamped Concrete), Minor Concrete (Seeded Aggregate Concrete), Minor Concrete (Curb Ramp), Remove Concrete Curb And Sidewalk (Sqyd), Pre/Post Construction Surveys, (F) - Miscellaneous Iron And Steel, (F) - Anti-Graffiti Coating, Chain Link Fence (Type Cl-6), 4' Chain Link Gate (Type Cl-6), Remove Chain Link Fence, Remove Pavement Marker, Reset Markers And Delineators, Guard Railing Delineator, Pavement Marker (Retroreflective), Milepost Marker, Treatment Best Management Practice Marker, Object Marker (Type P), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Roadside Sign - One Post, Post Sleeve, Install Framed Sign Panel, Midwest Guardrail System (Steel Post), Midwest Guardrail System (8' Steel Post), Vegetation Control (Crushed Shale), Remove Vegetation Control, Wildlife Passage Way (Type S), Single Thrie Beam Barrier (Type M), Double Thrie Beam Barrier (Type M), Transition Railing (Type Agt), Transition Railing Anchor Block, End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Buried Post End Anchor (Type B-F), Alternative Crash Cushion Tl-3, Concrete Barrier (Type 60Ms), Concrete Barrier (Type 86H), (F) - Concrete Barrier Transition, Remove Guardrail, Remove Concrete Barrier, Remove Concrete Barrier (Type K), Remove Crash Cushion, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, 12" Rumble Strip (Asphalt Concrete Pavement), Contrast Stripe Paint (1-Coat), 6" Traffic Stripe Tape (Warranty) (Broken 36-12), 6" Traffic Stripe Tape With Contrast (Warranty), 6" Traffic Stripe Tape With, Contrast (Warranty) (Broken 36- 12), Modifying Signal And Lighting Systems, Mobilization

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME