 Papich Construction Company Is  requesting quotations from all qualified DBE Sub-contractors  and Material suppliers for the following project:Agency:  Caltrans No. 06-487404
 Project:  Construction on State Highway In Tulare County In And Near Visalia From 0.6  Mile South Of Avenue 280 Overcrossing To 0.7 Mile North Of Avenue 280  Overcrossing
 Plans  & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
 DBE  Goal: 21% & The estimated cost of the project is $69,000,000.
 Bid  date: Thursday, October 17, 2024, at 2:00 PM
 Please submit all quotes by 1:00 PM on  10/17/24
 General  work description: Replace bridge structures and construct  roundabouts. Estimating  Dept.Email: estimating@papichconstruction.com
 Quotes for Services and Supplies  requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method  Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site  Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Develop Water  Supply, Construction Area Signs, Traffic Control System, Type Iii Barricade,  Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar  Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier  System, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Tl-3,  Temporary Traffic Screen, Job Site Management, Stormwater Pollution Prevention  Plan, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control),  Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Drainage Inlet  Protection, Temporary Fiber Roll, Temporary Silt Fence, Temporary Construction  Entrance, Street Sweeping, Temporary Concrete Washout, Remove Yellow  Thermoplastic Traffic Stripe (Hazardous Waste), Treated Wood Waste, Clearing  And Grubbing (Ls), Roadway Excavation, (F) - Structure Excavation (Bridge), (F)  - Structure Excavation (Retaining Wall), (F) - Structure Excavation (Soldier  Pile Wall), (F) - Structure Backfill (Bridge), (F) - Structure Backfill  (Retaining Wall), (F) - Structure Backfill (Soldier Pile Wall), (F) - Concrete  Backfill (Soldier Pile Wall), (F) - Lean Concrete Backfill, Imported Borrow  (Cy), Rock Mulch, Rock Blanket, 8" Corrugated High Density Polyethylene  Pipe Conduit, Move-In/Move-Out (Erosion Control), Bonded Fiber Matrix (Sqft),  Rolled Erosion Control Product (Netting), Fiber Rolls, Compost (Cy), Class 2  Aggregate Base (Cy), Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap  Graded), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type  E), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete  Pavement (Sqft), Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete  Pavement, Jointed Plain Concrete Pavement (Colored And Textured), Isolation  Joint Seal (Asphalt Rubber), Ground Anchor (Subhorizontal), (F) - Mechanically  Stabilized Embankment, Steel Soldier Pile (2 - Hp 10 X 57), Steel Soldier Pile  (2 - W 12 X 106), Steel Soldier Pile (2 - Hp 12 X 84), 36" Drilled Hole,  42" Drilled Hole, 24" Cast-In-Drilled-Hole Concrete Piling, 60"  Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), (F) - Structural  Concrete, Bridge Footing, (F) - Structural Concrete, Deadman Anchor, (F) -  Structural Concrete, Bridge, (F) - Structural Concrete, Bridge (Polymer Fiber),  (F) - Structural Concrete, Retaining Wall, (F) - Structural Concrete, Wall  Facing, (F) - Structural Concrete, Barrier Slab, (F) - Structural Concrete,  Approach Slab (Type N Modified), (F) - Structural Concrete, Drainage Inlet,  Concrete Surface Texture (Western Basalt), Furnish Precast Prestressed Concrete  Wide Flange Girder (70'-80'), Furnish Precast Prestressed Concrete Wide Flange  Girder (80'-90'), Furnish Precast Prestressed Concrete Wide Flange Girder  (90'-100'), Furnish Precast Prestressed Concrete Wide Flange Girder  (120'-130'), Furnish Precast Prestressed Concrete Wide Flange Girder  (130'-140'), Furnish Precast Prestressed Concrete Wide Flange Girder  (100'-110'), Erect Precast Prestressed Concrete Girder, Joint Seal (Mr  1"), (F) - Bar Reinforcing Steel (Wall Facing), (F) - Bar Reinforcing  Steel (Bridge), (F) - Bar Reinforcing Steel (Retaining Wall), (F) - Bar  Reinforcing Steel (Galvanized), (F) - Bar Reinforcing Steel (Deadman Anchor),  Furnish Sign Structure (Versatile Truss), Install Sign Structure (Versatile  Truss), Aluminum Walkway Grating (Versatile Truss), Remove Sign Structure (Ea),  (F) - Timber Lagging, Clean And Paint Steel Soldier Piling, Bridge Removal,  Location A, Bridge Removal, Location B, 24" Alternative Pipe Culvert,  18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, 12"  Downdrain Slip Joint, 12" Alternative Pipe Downdrain, 12" Steel  Flared End Section, 24" Alternative Flared End Section, Remove Culvert  (Lf), Remove Downdrain (Ea), Remove Inlet, Remove Headwall, Remove Flared End  Section (Ea), Adjust Inlet, Concrete (Concrete Apron), Rock Slope Protection  (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor  Concrete (Curb) (Cy), Minor Concrete (Gutter) (Lf), Detectable Warning Surface,  Minor Concrete (Miscellaneous Construction), Minor Concrete (Curb And Gutter),  Minor Concrete (Driveway), Minor Concrete (Sidewalk), Minor Concrete (Textured  Paving), Minor Concrete (Curb Ramp), Remove Concrete Sidewalk (Sqyd), Remove Concrete  Island (Portions) (Sqyd), Remove Concrete (Curb And Gutter), (F) -  Miscellaneous Iron And Steel, (F) - Miscellaneous Metal (Bridge), (F) -  Miscellaneous Metal (Tie Rod), Survey Monument (Type A), Prepare And Stain  Concrete, Fence (Type Bw, Metal Post), 8' Wire Mesh Gate, Remove Fence, Remove  Pavement Marker, Delineator (Class 1), Pavement Marker (Retroreflective),  Remove Roadside Sign (Wood Post), Furnish Laminated Panel Sign (1"-Type  A), Furnish Laminated Panel Sign (1"-Type B), Furnish Single Sheet Aluminum  Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign  (0.080"-Unframed), Furnish Single Sheet Aluminum Sign  (0.063"-Framed), Furnish Single Sheet Aluminum Sign (0.080"-Framed),  Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And  Saddle Bracket Method), Install Roadside Sign (Laminated Wood Box Post),  Furnish Laminated Wood Box Post (Type M), Midwest Guardrail System (Steel  Post), Vegetation Control (Minor Concrete), Chain Link Railing (Type 3), (F) -  Tubular Bicycle Railing, (F) - Cable Railing, Transition Railing (Type Agt),  End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3,  Alternative Crash Cushion Tl-3, Concrete Barrier (Type 60Md), Concrete Barrier  (Type 60Mgf), (F) - Concrete Barrier (Type 732Sw), (F) - Concrete Barrier (Type  732Sw Modified), (F) - Concrete Barrier (Type 842A Modified), (F) - Concrete  Barrier (Type 836A Modified), (F) - Concrete Barrier (Type 836B), (F) -  Concrete Barrier (Type 836 Modified), Concrete Barrier Transition, (F) - Concrete  Barrier (Type 842B), Remove Guardrail, Remove Concrete Barrier, Thermoplastic  Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic  Stripe (Enhanced Wet Night Visibility) (Broken 6- 1), 6" Thermoplastic  Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), 6"  Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12),  6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 6"  Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 8- 4), 8"  Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8"  Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3),  12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove  Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Lighting  System, Ramp Metering System, Changeable Message Sign System, Camera Systems,  Modifying Lighting Systems, Modifying Signal And Lighting Systems, Modifying  Changeable Message Sign Systems, Removing Lighting Systems, Removing Traffic  Monitoring Stations, Removing Changeable Message Sign Systems, 4" Conduit  (Bridge), Mobilization Requirements: At the time of the bid, all subcontractors must possess a valid and relevant  California Contractors License, a valid DIR registration number, meet the  project’s minimum insurance requirements, and be 100% bondable. All  subcontractor, supplier, and trucking proposals must be in strict accordance  with the project plans, specifications, and any addenda issued. In addition,  all Supplier and Subcontractors will be required to execute Papich’s standard  subcontract or purchase order agreement (available upon request). Waiver of  Subrogation will be required. Papich is a signatory contractor and will require  a one-time job agreement for any non-union Subcontractors. Submission of a  proposal shall constitute subcontractor, supplier, or trucker acceptance of all  terms as listed above. Any attempted deviation or revision to said terms shall  not be recognized by Papich. Papich can offer DBE firms assistance with bidding  this contract including but not limited to: reducing items of work into smaller  scopes, providing reimbursement for payment/performance bond premiums, and  providing assistance obtaining materials. All requests for assistance must be  made prior to the project bid date. Additionally, DBE firms must possess a  valid and current certification to be considered for this contract. Questions  concerning above requirements should be directed to our office prior to  submission of a proposal. 
 Heavy Civil | Oil & Gas | Power | Site Development | Transportation398 Sunrise Terrace | Arroyo Grande, CA 93420
 Phone: 805-473-3016 Fax: 805-481-5966
 |