Agency: Eastern Municipal Water District
Project: Mission Canyon I Pipeline & Mission Canyon II Booster Pump Station Replacement - Spec 1530W-REBID
Location: Riverside, CA
Plans & Specs | https://vendors.planetbids.com/portal/25577/bo/bo-detail/121140
DBE/MBE/WBE participation
Bids open October 8, 2024, at 10:00 AM
Schedule A – Mission Canyon I Pipeline: The work comprises construction of approximately 850 linear feet of 12-inch PVC pipe including all appurtenances, connections to existing lines, services, installation of temporary water service to meter at 41477 Gibbel Road, and installation of new fire hydrants. The proposed 12-inch PVC pipe will connect to an existing 6-inch CML&C pipe at Gibbel Road and to the existing Mission Canyon I tank. In addition, the work includes modifications to the above-ground piping and valve enclosure adjacent to the Mission Canyon I Tank.
Work shall include all restrained joints, valves, air valves, fire hydrants, water services, shoring and bracing per California Labor Codes, backfill, pavement removal, replacement and restoration, trench and pipeline dewatering, high lining to facilitate service connections as needed, exposure and field welding of existing steel pipe joints, disinfection, traffic control, SWPPP, abandonment of the existing 4” ACP and filling as needed, and other appurtenant work. All work shall be in accordance with these specifications and contract drawings.
Schedule B – Mission Canyon II Booster Pump Station Replacement: Under these Specifications the Contractor shall perform all labor, equipment, and materials necessary for construction of a complete and operable booster pump station, including all earthwork (including grading and importing select fill material and backfill material); connections to pipelines; site piping; SCE electrical service installation for new facilities and removal/coordination for existing facility; packaged enclosed skid-mounted booster station, and a packaged enclosed skid-mounted electric generator, motor control center, electrical conduit and wiring; and the complete demolition of the existing Mission Canyon II Pump Station. Site work includes drainage piping, a masonry wall fence, site lighting, a motor operated wrought iron gate, and concrete and asphalt paving. The pipeline work includes approximately 3,200 feet of new 12-inch PVC and approximately 1,000 feet of 8-inch PVC pipe to replace an existing 4-inch CML&C waterline including all pipe, trenching, backfill, compaction, temporary and permanent pavement, air valves, fire hydrants, valves, thrust blocks and restrained joints and all appurtenant work required to complete the pipelines and pump station, complete, in place and operable in accordance with these specifications and the contract drawings
Quotes for Services & Supplies requested for the following items for bid including, but not limited to: SWPPP, Aggregates Supply, Pipes and Fittings, Cold Planning, AC Paving, Landscaping, Saw Cutting, Traffic Control, Survey, Electrical, Demolition, Fencing, & Trucking. See plans and specs for complete list of bid items.
RE Chaffee is an Equal Opportunity Employer. We will negotiate and breakdown any portion of contract bid item to encourage & facilitate MBE/SBE/WBE/DBE/DVBE participation as well as assist in obtaining necessary equipment, supplies, materials or related assistance or services. RE Chaffee will assist with obtaining bonding, lines of credit, and insurance. The US Small Business Administration may assist you in obtaining bonding ‐ please visit: http://www.sba.gov/content/contractors# for additional information. Subcontractors must possess a current contractor’s license, insurance, workers compensation and be registered with a current DIR number.
RE CHAFFEE
General Engineering Contractors
License No. 897948 A
Phone: 760-403-5456
Safety ~ Quality ~ Service |