  
            Griffith Company Requests Sub-bids from All  Qualified & Certified DBE Subcontractors/Suppliers for: 
          Contracting  Agency: City of Tehachapi - ATPL-5184(040)  
                Project:  SRTS Dennison Road Bicycle / Pedestrian Corridor Improvement Project 
                Bid  Date: July 23, 2024, at 10:30 AM  
                DBE  Goal: 11%  
                Plans  & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/vj843xs7j74vlxigz4gxl/ADmArdMpP_eV0hsakXuvchM?rlkey= 
                  xd6yf5xoca4ieog5gz2wrtop0&dl=0 
          The project consists of installing concrete  curb and gutter, sidewalk, RRFBs, and pavement construction along Dennison  Avenue from Pinon Street to Tehachapi Boulevard. Additionally, the project  includes the removal and installation of signing and striping improvements,  
                installation of concrete curb ramps,  installation of storm drain infrastructure, concrete transition sidewalks, and  other various improvements. 
          Scope of Work: Mobilization  & Demobilization, Traffic Control, Water Pollution Prevention and Dust  Control, Survey & Staking, Clearing and Grubbing, Miscellaneous Demolition  and Disposal, Miscellaneous Facilities and Operations, Sawcut & Remove  Asphalt Concrete, Tree Removal, Hot Mix Asphalt (Asphalt Concrete), Aggregate  Base (Class II), Install Residential Drive Approach, Install Accessibility  Ramps, Minor Concrete Curb and Gutter (Curb and Gutter, Separate from Ramp  Details and Drive Approach Detail), Minor Concrete Sidewalk (Sidewalks,  Separate from Ramp Details and Drive Approach Detail), Concrete Median Curb,  Install 2” Non-Potable Water Pipe, Install 24” Storm Drain Pipe, Install 36”  Storm Drain Pipe, Storm Drain Connection to Existing, Install Drain Inlet,  Install Blinker Sign, Signing, Pavement Striping, and Marking, Record Drawings. 
          Requirements: Griffith Company is  signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and  Carpenters Unions. 100% performance and payment bonds required for the full  amount of the subcontract price. Subcontractors must possess a current  contractor’s license, insurance and worker’s compensation insurance coverage  meeting Griffith’s requirements. A copy of the insurance requirements and  agreements can be obtained by contacting the Estimator. Please call if you need  assistance in obtaining bonding, insurance, equipment, materials, and/or  supplies. Griffith Company intends to work cooperatively with all qualified  firms seeking work on this project. Griffith Company is an Equal Opportunity  Employer. Griffith Company will work with interested subcontractors to identify  opportunities to break down items into economically feasible packages.
          Griffith Company 
                CA Contractors License #88 
                1128 Carrier Parkway Avenue Bakersfield, CA 93308 
                Phone: 661-392-6640 Fax: 661-393-9525  |