www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date May 13th, 2024 @ 4:48 p.m. through bid opening date


2185 La Mirada Drive
Vista, CA 92081
Tel  760.597.9660 
Fax 760.597.9661


Is requesting quotations from all qualified DBE/WBE/MBE Sub-contractors and Material suppliers performing commercially useful functions for the following project:
Agency: East County Advanced Water Purification JPA

Project: East County Advanced AWP Package #4
Notice Inviting Bid: May 13, 2024
Deadline for Questions: May 24, 2024, at 5:00PM
Prequalification Packets Due: March 24, 2024, at 5:00PM

Bids Due: June 12, 2024, at 5:00PM Tentative Selection Date: July 2024

Time of Completion: Construction of the East County Advanced Water Purification project is set to start at the beginning of January 2025. The project end date is scheduled for December 2027. The bulk of the construction work will take place from March 2025 through June 2027.

Plans, Specs, Amendments, and Project Information can be accessed through Orion Construction Corporation at:
https://orionconstructiongcc-my.sharepoint.com/personal/alex_birch_orionconstruction_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Falex%5Fbirch%5Forionconstruction%5Fcom%2FDocuments%2FECAWP%20Package%20%234&ga=1

Summary of Work: The East County Advanced Water Purification project is a 10-mile pipeline that will start on East Mission Gorge Road near the 52 and 125 over pass in Santee. The pipeline will begin at the East Mission Gorge Pump Station and make its way west on Mission Gorge Road through Father Junipero Trail and then back onto Mission Gorge Road, heading west until it reaches Zion. From this point, the pipeline will traverse through Zion, Riverdale, Vandever and Fairmont heading south to Camino Del Rio North near the I-8 freeway. The pipeline will then head west on Camino Del Rio North ending just past the I-15 freeway overpass at an existing Manhole.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to:
Survey, Settlement Monitoring, QA/QC/Testing, Asphalt Paving, Profilograph, PCC Flatwork, Slurry Seal, CIPP Lining, Pipe Cleaning, Cellular Fill, Traffic Loops and Ped Push Buttons, Striping.

Estimator: Alex Birch at alex.birch@orionconstruction.com

Alex Birch at alex.birch@orionconstruction.com is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. Please call if you need assistance with: bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials, or any related services. Orion Construction is willing to breakdown items into economical feasible packages. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work to help encourage and facilitate participation. Orion Construction intends to work cooperatively with all qualified firms seeking work on this project.  Please provide your contractor's license #, DBE cert # and DIR # with your quote.

Requirements: For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (“Section 1725.5”).No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5.  No bid shall be accepted, nor any subcontract entered into without proof of the Subcontractor’s current registration to perform public work pursuant to Section1725.5. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors# California Access to Capital Program Financing Solutions for your small business! http://www.calbizfinance.org/cal_cert_biz_program.html
 
Orion Construction Corporation is a nonunion company. 100% performance and payment bonds may be required for the full amount of subcontract price. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage, meeting Orion Construction Corporation’s requirements.

Orion Construction Corp.
2185 La Mirada Drive
Vista, CA 92081
Tel  760.597.9660
Fax 760.597.9661

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run from date posted through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME