
License No. 626859
5400 Hanna Ranch Road Novato, CA 94945
Phone: 415.456.8972 Fax: 415.459.0665
THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, but ESPECIALLY DBE Subcontractors, suppliers & truckers for the following project:
Caltrans No. 05-1H4704
Name: Construction on State Highway In Santa Cruz County Near Boulder Creek At San Lorenzo River Bridge And At Kings Creek Bridge
General work description: Replace bridges and install MGS.
Plans & Specs: https://tpcorp.box.com/s/37xlz24ywftqnd3dacwn3pnsgv7ji7p7
Engineers Estimate: $12,500,000
20% DBE Requirement
Bid Date: Wednesday May 21st, 2025 @ 2:00 PM
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute- Resolution-Board-Related Tasks, Construction Area Signs, Traffic Control System, Type Iii Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Temporary Barrier System, Temporary Shuttle Service, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Tl-3, Job Site Management, Water Pollution Control Program, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Gravel Bag Berm, Temporary Large Sediment Barrier, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Temporary Creek Diversion Systems, Work Area Monitoring (Bridge), Treated Wood Waste, Contractor Supplied Arborist, Bat And Bird Exclusion Devices, Temporary Wildlife Exclusion Fence, Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, (F) - Structure Excavation (Bridge), (F) - Structure Excavation (Retaining Wall), (F) - Structure Backfill (Bridge), (F) - Structure Backfill (Retaining Wall), Roadside Clearing, Soil Amendment, Plant (Group H), Plant (Group A), Plant (Group B), Plant Establishment Work, Wood Mulch, Foliage Protector, Temporary Irrigation System, Move- In/Move-Out (Erosion Control), Rolled Erosion Control Product (Netting), Willow Wattle, Compost Sock, Hydroseed, Compost (Cy), Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, 30" Cast-In-Drilled- Hole Concrete Piling, (F) - Structural Concrete, Bridge, (F) - Structural Concrete, Bridge (Polymer Fiber), (F) - Structural Concrete, Retaining Wall, (F) - Structural Concrete, Approach Slab (Type Eq), Drill And Bond Dowel (Chemical Adhesive)(Lf), Furnish Precast Prestressed Concrete Box Girder (100'-110'), Erect Precast Prestressed Concrete Box Girder, Joint Seal (Mr 1 1/2"), (F) - Bar Reinforcing Steel (Bridge), (F) - Bar Reinforcing Steel (Retaining Wall), (F) - Bar Reinforcing Steel (Epoxy Coated), (F) - Headed Bar Reinforcement, Public Safety Plan, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, (F) - Place Polyester Concrete Overlay, Bridge Removal, Location A, Bridge Removal, Location B, 12" Corrugated Steel Pipe Downdrain (.079" Thick), Slope Paving (Rock Cobble), Rock Slope Protection (150 Lb, Class Iii, Method B) (Cy), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Miscellaneous Construction), (F) – Miscellaneous Metal (Bridge), Survey Monument (Type D), Stain Galvanized Surfaces (Ls), Reset Mailbox, Precast Concrete Bat House, Remove Pavement Marker, Pavement Marker (Retroreflective), Remove Roadside Sign (Wood Post), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Roadside Sign – One Post, Midwest Guardrail System (Steel Post), Midwest Guardrail System (8' Post), (F) - Tubular Bicycle Railing, Transition Railing (Type Agt), Alternative Crash Cushion Tl-3, Concrete Barrier (Type 85 Modified), Remove Guardrail, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 6" Traffic Stripe Tape With Contrast (Warranty), Temporary Signal Systems, Mobilization
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Small businesses including DBE/WBE/MBEs are encouraged to look at Caltrans California Construction Contracting Program Website for possible bonding assistance.
https://buildcalifornia.com/
Thompson Builders Corporation
an Equal Opportunity Employer
Contact: Kelsey Heaphy
PHONE: (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com |