  
          Caliba Inc. is  seeking qualified subcontractors, suppliers and DVBE for the  Science Center ‐ Owner Furnished Furnishings & Equipment at Santa Ana College Project. 
          
          Please see the NIB or Specification section for the subcontractor’s  prequalification requirements. 
          Caliba Inc. an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers including certified DVBE firms performing commercially useful function for the following items of work, including but not limited to: Surface Mounted Wall Backing, Seismic Bracing and Equipment Anchorage, Provide anchorage for OFOI equipment. Cabinetry Modification, Windows, Safety Mirror, Lectern Plaques & Sign Relocation. 
          SCOPE OF WORK: The Project consists of backing, seismic anchorage, signage relocation and installations, and limited specialties for Rancho Santiago Community College District, in compliance with the Contract Documents and Code requirements 
          Caliba Inc.  requires 100% Performance  & Payment Bonds. If requested,  and as Caliba Inc. way of assisting subs in obtaining bonds, lines of credit and insurance  in the preparation of this project, we  can initiate introduction to agents known to us. Caliba Inc. can also assist in obtaining equipment, supplies, materials or related  assistance or services in  the preparation of this project.  Caliba Inc. is relying  on the price submitted  in a subcontractor's proposal as an all-inclusive  price for its trade scope  found in the plans,  specifications and addenda regardless of any qualifying language in the  proposal. Caliba Inc.'s listing of a subcontractor  is not an acceptance of any or all of that  subcontractor's conditions, qualifications, exclusions or exceptions  included in the subcontractor's  bid proposal. The subcontractor agrees that its  bid will remain valid for the  same period of time that the prime contractor's bid must remain valid with the owner, as  specified in the project's  specifications. 
          Each listed  subcontractor must execute Caliba Inc. standard subcontract  agreement if Caliba Inc. is awarded the project;  the standard subcontract is available for review at Caliba  Inc.’s office. At the discretion of Caliba Inc., any listed  subcontractor that withdraws its bid after Caliba Inc. submits its bid  to the owner will be responsible  for the difference in price  for such scope of work charged  by the replacement subcontractor. 
          This is  a prevailing wage project.  If this project is subject  to a Project Labor Agreement or Project Stabilization  Agreement, you will be required  to honor the terms of  such agreement. 
           
            Caliba Inc. 
            8031 Main Street, Stanton, CA 90680
  |