Shimmick Construction Company, Inc. is a Prime Contractor requesting bids from DBE certified firms. Subcontractors/Professional Services/Suppliers for the following project:
City of Redlands Municipal Utilities Dept | Project No. 521006
Redlands Wastewater Treatment Plant Upgrades - Phase 2
Bid Date: April 2, 2026 at 1:00 PM
Bids should be received no later than 2:00pm on April 1, 2026, quotes received after the time listed may be considered non-responsive.
The work to be done under this Contract includes the furnishing of project management, labor, materials, tools, and equipment for the construction of the Redlands Wastewater Treatment Plant Upgrades Project - Phase 2, all in accordance with the Contract Documents
Scopes of work requested, but not limited to: Pump, Pipe Supply (Rcp), Pipe Supply (Pvc), Pipe Supply (Steel/Ductile Iron), Pipe Supply (Cmlc), Pipe Supply (Hdpe), Pipe Supply (Stainless Steel), Pipe Supply (Vcp), Pipe Supply (Cmp), Precast Supply (Utilities), Pothole , Minor Concrete Structures , Misc Iron & Steel - Furn, Dewatering , Ac Paving , Aggregate Supply, Rip Rap Supply, Demolition , Fencing , Flatwork , Excavation & Grading , Shoring, Landscape & Irrigation , Street Sweeper, Geotextile/Erosion Cntrl Supply, Swppp/Erosion Cntrl , Concrete Washouts, Trucking , Misc. Metal , Misc. Metal Supply, Frp / Composites Supply, Waterproofing - , Joint Seal - , Post Tensioning , Ready Mix Supply, Reinforcing Steel , Minor Structures , Fire Systems , Hvac , Plumbing , Mechanical , Pump Supply, Valves - Non Plastic, Pipe Supports, Gate Supply, Pipe Insulation, Crossing Panels, Ceiling , Doors , Doors Overhead/Rolling , Specialty Doors, Paint & Coatings , Electrical , Qa/Qc , Survey , Security. Additional Scopes of Work may be found in the project documents.
Shimmick Construction requests that Non-DBE subcontractors provide lower-tier DBE participation. Bidders are requested to indicate any lower-tier participation information so it can be evaluated as part of their quote.
For additional project information or to discuss delivery schedules, obtaining bonding, lines of credit, insurance, technical assistance, necessary equipment, supplies, and/or materials please contact the lead estimator, Kyle Nelius (kyle.nelius@shimmick.com) or (949) 333-1500.
Shimmick Construction Company, Inc. - 530 Technology Drive, Suite 300
Irvine, CA 92618 Phone: (949) 333-1500 Fax: (949) 333-1510
Send all quotes and/or questions regarding to this project to email estimating.southwest@shimmick.com
CONTRACTOR REGISTRATION REQUIREMENTS: Labor Code Section 1771.1 (a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
Bids submitted will confirm the acceptance of the terms and conditions of SCCI’s Standard Long Form Subcontract or Purchase Order, available upon request. A Subcontractor/Supplier providing a proposed bid/price will be viewed as accepting SCCI’s Standard Long Form Subcontract or Purchase Order-100% Performance and Payment bonds are required for subcontractors; material bonds are required from all suppliers. Shimmick Construction will pay bond premium up to 2%. Subcontractors/Suppliers will be required to abide by terms and conditions of the AGC Master Labor Agreements. All proposers are bound by the prime contract terms and conditions, including payment provisions. Insurance coverage is required as set by the prime contract and/or Shimmick Construction – whichever is greatest. Minimum insurance requirements: General Liability $1M-Per Occurrence/$2M-Agg/$2M-Completed Operations; Excess Liability $5M; Auto Liability $1M; Workers Comp & Employer Liability $1M. Project specific insurance requirements are provided in detail the Special Conditions. The listing of a Subcontractor/Supplier is not to be construed as an acceptance of all the conditions or exceptions included with the price quote. Shimmick requires that Subcontractor & Supplier price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.
Shimmick Construction Company, Inc. is An Equal Opportunity Employer |