
License# 644515
An Equal Opportunity Employer
Is requesting quotations from all qualified MBE/WBE/DBE/SBEsubcontractors and material suppliers for the following project:
Agency: Delta Diablo Sanitation District
Project: 1124
Project Name: Bay Point Sewer Repairs
Project Description: Ghilotti Construction Company, Inc. is seeking certified MBE/WBE/DBE/SBE subcontractors, suppliers and truckers for the Bay Point Sewer Repairs in Bay Point, CA. The work consists of the construction of 8” sanitary sewer; replace VCP w/8” PVC; replace manholes and outside drops; removal of rodding inlets and manholes; construction of manholes; point repairs; lateral reinstatement; abandon existing sewer mains; sewage flow control.
Engineer's Estimate: $1,092,000.00
MINORITY GROUPS: MBE/WBE/DBE/SBE
123 CD / $1,800.00 per day LD
Submit quotes by 8:00 a.m. on bid date.
Contact our estimator for more information or assistance.
GCC is available to discuss breaking out any portion of work to encourage minority participation.
Location: Contra Costa County, CA
Bid Date: April 29, 2014 at 10:00 am
This request includes, but is not limited to, the following:
TRAFFIC CONTROL, BYPASS PUMPING, ABANDON SEWER MAIN, SAWCUTTING, STRIPING, STREET SWEEPING AND TRUCKING. SUPPLIERS OF SHORING, AGGREGATE, CONCRETE, ASPHALT, MANHOLE STRUCTURE AND PIPE
Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Bid documents may be downloaded from http://www.bidsync.com at no cost. Plans may also be downloaded through various local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Info: Mr. Rod Barber (707/585-1221 or rod@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
**GHILOTTI CONSTRUCTION COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**
Ghilotti Construction Company, Inc.
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Annette Conley
annette@ghilotti.com |