Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: January 25th, 2013 through bid opening date

Granite Construction Company

An Equal Opportunity Employer

Is requesting sub-bids from qualified DBE Subcontractors and Suppliers for the following project:

CALTRANS

CONTRACT NO. 05-0G1604

SANTA BARBARA COUNTY HWY 166 NEAR GUADALUPE FROM SIMAS STREET TO 1.5M E OF SIMAS STREET

RELOCATE DRAINAGE DITCHES

BID DATE: 2/12/2013 BID TIME: 2PM

Granite Construction Company (Granite) requests subquotes from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for the following items of work, including but not limited to: Temp Fence (ESA), QSD/QSP, Prepare SWPPP, Temp Construction Entrance, Temp Check Dam, Street Sweeping, Concrete Washout, Construction Area Signs, Traffic Control, Portable CMS, Remove MBGR, , Remove Culverts, Remove RCB Culvert, Remove Headwall, Remove AC Surfacing, Reset Mailbox, Reset Milepost Marker, Reset Roadside Signs, Clearing & Grubbing, Roadway Excavation, Fiber Rolls, Hydroseeding, Class 2 AB, HMA (type A), Minor Concrete (Minor Structure), Rebar, Alternative Pipe Culverts, Concrete Backfill, Rock Slope Protection, RSP Fabric, Concrete Channel Lining, BW Fence, MBGR, Delineators, Object Markers, Striping and Marking, Modify Signal, Modify Lighting, Trucking.

. ** ALL SCHEDULE OF BID ITEMS OPEN FOR BID **

Including items of work normally performed by Granite.

Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Granite’s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator.

Plans and specifications are available for viewing at our office located at: 5335 Debbie Lane Santa Barbara, CA 93111

Please call if you need any bidding assistance including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

Granite intends to work cooperatively with all qualified DBE firms seeking work on this project.

Granite Construction Company

P.O. Box 6744
Santa Barbara, California 93160
Phone (805) 964-9951

Fax (805) 967-1431

Contact: BRIAN LARINAN

BRIAN.LARINAN@GCINC.COM

Published on January 25th, 2012 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME