
HighLand Construction, Inc. – License #743775 (A)
133 North Pixley Street, Orange, CA 92868
Phone: 714-538-5156 Fax: 714-538-5157
An Equal Opportunity Employer
Request for sub-bids from certified DBE subcontractors and material suppliers for the following project:
Agency: Caltrans
Contract No. 12-0J6704
Job Name: Reconstruct Slope, Upgrade Drainage System and Hydroseeding.
Location: Orange County in Anaheim and Yorba Linda from Santiago Cyn. Road
Overcrossing to Santa Ana Cyn. Road Undercrossing.
(12-Ora-241-32.5/39.0)
DBE Goal 12 %
Bid Date: Febrary 7, 2013 @ 2:00 p.m.
Trades: We are accepting all quotes from all vendors, subcontractors, and material
suppliers, including all DBEs, for all items of work including, but not limited to:
Temporary ESA Fence, Construction Site Management, Prepare WPCP,
Temporary BMPs, Street Sweeping, Construction Area Signs, Traffic Control
System, Portable CMS, Remove Dike, Remove Culvert, Remove Headwall,
Adjust Inlet, Clearing and Grubbing, Roadway Excavation, Lead Compliance
Plan, Imported Borrow, Erosion Control (compost Blanket and Hydroseed),
Class 2 Aggregate Base, Asphalt Treated Permeable Base, HMA (Type A &
Open Graded), Place HMA Dike (Type D), Minor Concrete, 24” Corrugated
Steel Pipe, 3” Plastic Pipe (Edge Drain), Rock Slope Protection (1/4 T, Method
B and Light Method B), Concrete (Ditch Lining), Modify Traffic Monitoring
Station and Modify Lighting.
Items of work may be broken down into
economically feasible packages to encourage participation.
Plans and specifications for this project are available in electronic format from
the Department of Transportation. To obtain these documents, go to
http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php. You may also view
plans at your local Dodge Greensheet Plan Room or at our office by
appointment.
HighLand Construction, Inc. is an Equal Opportunity Employment Company.
Performance and Payment Bonds may be required for this project, unless
specifically waived at Prime Contractor’s option. We will assist in payment of a
reasonable bond premium. Please provide a bond premium rate with your quote. We will assist in payment of a
reasonable bond premium. Please provide a bond premium rate with your quote.
If you have any questions or need assistance in obtaining bonding, lines of credit,
insurance, equipment, supplies, materials or related assistance, please contact
our office at
714-538-5156.
Subcontractors must possess a current contractor’s license, insurance and
worker’s compensation coverage meeting Caltrans’ requirements and will be
required to sign the standard HighLand Construction Subcontract Agreement.
Please send your current certification with your bid proposals.
Contact: Erin Richardson |