Advertisement date: August 28th, 2013 through bid opening date

Granite Construction Company

An Equal Opportunity Employer

Is requesting sub-bids from qualified DBE Subcontractors and Suppliers for the following project:

CALTRANS

CONTRACT NO. 05-0G0704

UPGRADE DRAINAGE CULVERTS

SANTA BARBARA COUNTY IN GOLETA FROM 0.2M EAST TO 0.07M

WEST OF FAIRVIEW AVE OVERCROSSING

BID DATE: 10/15/2013       BID TIME: 2 PM

Granite Construction Company (Granite) requests subquotes from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for the following items of work, including but not limited to:

LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY LARGE SEDIMENT BARRIER, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TEMPORARY FENCE (TYPE ESA), TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (LS), NATURAL RESOURCE PROTECTION PLAN, ABANDON DRAINAGE FACILITY, REMOVE WOOD FENCE, REMOVE CHAIN LINK FENCE, REMOVE MASONRY BLOCK WALL, REMOVE METAL BEAM GUARD RAILING, REMOVE SINGLE THRIE BEAM BARRIER, REMOVE DOUBLE THRIE BEAM BARRIER, REMOVE IRRIGATION FACILITY, REMOVE PAINTED TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE PAVEMENT MARKER, REMOVE SIGN STRUCTURE (EA), REMOVE ASPHALT CONCRETE PAVEMENT (SQFT), REMOVE ASPHALT CONCRETE DIKE,
REMOVE REINFORCED CONCRETE BOX CULVERT (CY), REMOVE INLET,
REMOVE HEADWALL, RESET ROADSIDE SIGN (ONE POST), COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE CONCRETE BARRIER, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), STRUCTURE EXCAVATION (TYPE A), STRUCTURE EXCAVATION (TYPE D), STRUCTURE BACKFILL (BRIDGE), LIGHTWEIGHT EMBANKMENT (EPS BLOCK), GEOMEMBRANE (GASOLINE RESISTANT), STRUCTURE BACKFILL (LIGHTWEIGHT EMBANKMENT), ROADSIDE CLEARING, ROCK STAIN, LIVE SILTATION, WILLOW CUTTINGS, WILLOW POLE, MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, CHECK AND TEST EXISTING IRRIGATION FACILITIES, MAINTAIN EXISTING IRRIGATION FACILITIES, CONTROL AND NEUTRAL CONDUCTORS, 1 1/2" ELECTRIC REMOTE CONTROL VALVE, 2" ELECTRIC REMOTE CONTROL VALVE, TEMPORARY IRRIGATION LINE, SPRINKLER (TYPE C-2), 3" GATE VALVE,   3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 3" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), BALL VALVE, 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, EXTEND 8" CONDUIT, MOVE-IN/MOVE-OUT (EROSION CONTROL),   IMPORTED TOPSOIL (CY), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, STRAW, HYDROSEED (MIX A), HYDROSEED (MIX B), HYDROSEED (MIX C), COMPOST (TYPE 1), COMPOST (TYPE 2), INCORPORATE MATERIALS, CLASS 1 AGGREGATE SUBBASE, CLASS 2 AGGREGATE BASE (CY), LEAN CONCRETE BASE, HOT MIX ASPHALT (TYPE A), SHOULDER RUMBLE STRIP (HMA,GROUND-IN INDENTATIONS), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT  (MISCELLANEOUS AREA), TACK COAT, FURNISH 24" STEEL PIPE PILING, DRIVE 24" STEEL PIPE PILE, FURNISH PILING (CLASS 200) (ALTERNATIVE W), DRIVE PILE (CLASS 200) (ALTERNATIVE W), 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), SEAL COURSE CONCRETE, STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ), STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N), MINOR CONCRETE (MINOR STRUCTURE), MASONRY BLOCK WALL, JOINT SEAL (MR 1/2"), BAR REINFORCING STEEL (BRIDGE), HEADED BAR REINFORCEMENT, FURNISH SIGN STRUCTURE (TRUSS), INSTALL SIGN STRUCTURE (TRUSS), FURNISH LAMINATED PANEL SIGN (1"-TYPE A), INSTALL SIGN PANEL ON EXISTING FRAME, 24" ALTERNATIVE PIPE CULVERT, TEMPORARY CULVERT, 24" PLASTIC PIPE, 18" REINFORCED CONCRETE PIPE (CLASS V), 24" REINFORCED CONCRETE PIPE (CLASS V), TEMPORARY SLOTTED CORRUGATED STEEL PIPE, STRUCTURE APPROACH DRAINAGE SYSTEM,  
3" SLOTTED PLASTIC PIPE UNDERDRAIN, 4" PLASTIC PIPE (EDGE DRAIN),  
4" PLASTIC PIPE (EDGE DRAIN OUTLET), CLASS 2 PERMEABLE MATERIAL (BLANKET), TEMPORARY DRAINAGE INLET, DRAINAGE INLET MARKER,  
6" WELDED STEEL PIPE CASING (BRIDGE) (.250" THICK), TEMPORARY FLARED END SECTION, 24" ALTERNATIVE FLARED END SECTION,   TEMPORARY CAP INLET, 36" PRECAST CONCRETE PIPE INLET, INLET DEPRESSION, ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (NO. 1, METHOD B) (CY), GABION, ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MINOR CONCRETE (GUTTER DEPRESSION), MINOR CONCRETE (EXPOSED AGGREGATE CONCRETE), MISCELLANEOUS IRON AND STEEL, WATER LINE (GOLETA WATER DISTRICT), SEWER LINE (GOLETA SANITARY DISTRICT), TEMPORARY FENCE (TYPE CL-6), TEMPORARY FENCE (TYPE CL-6, SLATTED), CHAIN LINK FENCE (TYPE CL-6), WOOD FENCE, 4' CHAIN LINK GATE (TYPE CL-6), 8' CHAIN LINK GATE (TYPE CL-6), 16' CHAIN LINK GATE (TYPE CL-6), CHAIN LINK FENCE (TYPE CL-8, SLATTED, MODIFIED), 4' CHAIN LINK GATE (TYPE CL-8, SLATTED, MODIFIED), METAL BEAM GUARD RAILING (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), CHAIN LINK RAILING (TYPE 7), DOUBLE THRIE BEAM BARRIER (STEEL POST), TRANSITION RAILING (TYPE WB), TRANSITION RAILING (TYPE DTB), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE FLARED TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60A), CONCRETE BARRIER (TYPE 60R MODIFIED), CONCRETE BARRIER (TYPE 80), CONCRETE BARRIER (TYPE 60 MODIFIED), CALIFORNIA ST-40 BRIDGE RAIL (MOD), THERMOPLASTIC PAVEMENT MARKING, THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), PAVEMENT MARKER (NON-REFLECTIVE), PAVEMENT MARKER (RETROREFLECTIVE), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFY WIRELESS VEHICLE DETECTION SYSTEM, MODIFY SIGNAL, MODIFY LIGHTING AND SIGN ILLUMINATION

** ALL SCHEDULE OF BID ITEMS OPEN FOR BID **

Including items of work normally performed by Granite.

Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds are required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Granite’s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator.

Plans and specifications are available for viewing at our office located at: 5335 Debbie Lane Santa Barbara, CA 93111

Please call if you need any bidding assistance including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

Granite intends to work cooperatively with all qualified DBE firms seeking work on this project.

Granite Construction Company

P.O. Box 6744
Santa Barbara, California 93160
Phone (805) 964-9951

Fax (805) 967-1431

Contact BRIAN LARINAN

Brian.larinan@gcinc.com

 

Published on August 28th, 2013 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 