Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: August 19th, 2011 through bid opening date

SEMA Construction

6 Orchard, Ste. 150
Lake Forest, CA 92630
Phone: 949-470-0500
Fax: 949-829-0100

Bid Information:

OWNER:                             US Army Corps of Engineers

BID DATE:                          Tuesday, August 30th, 2011 @ 1:00 PM                    

LOCATION:                       Lower Santa Ana River Channel, Reach 9 – Phase 2A

PROJECT NO.:                  W912PL-11-B-0003

 

            SEMA Construction, Inc. is requesting quotes from Subcontractors and Suppliers to meet the goals for minority participation. The goals are as follows: 50% with small business, 17% with small disadvantaged business, 18% with women owned business, 8.5% with veteran owned small business 4% with service disabled veteran owned small business and 10% with HUB Zone small business. Subcontractors may be required to comply with the various Labor Agreements in the respective trade unions.  Contract retention will be withheld and/or paid in accordance with applicable Owner’s contract provisions.  Please include price of Payment & Performance Bonds, at 100%, in your quote.   Please allow for prices to be held for at least 60 days from the date of Notice of award. 

Plans & specs can be viewed and downloaded at:  www.sema.box.net/Reach9

SEMA Construction, Inc., attn:  Estimating Dept., 6 Orchard, Ste. 150, Lake Forest, CA  92630, phone 949-470-0500 or fax 949-829-0100; Direct Technical Questions To: Pat Johnston Div 1 & 2 or Tony Mendez Div 3 at  949-470-0500; fax 949-829-0100

Qualified minority firms are encouraged to participate.  Bonding, LOC, and special insurance limits may be required; please contact SEMA for assistance.  We will assist with any technical information relating to plans, specs and requirements for work being provided.  Where needed, SEMA will help with obtaining necessary equipment, supplies, materials, or related assistance and/or services.  EOE

Remarks
General work description: Excavation and backfill for construction of approx 6,000 feet to 24” thick grouted stone bank protection and approx 1,800 feet of steel sheet pile with tie back anchors.
Items include, but not limited to: 

Trades Required: AC – Hot Mix/Paving/Rubberized, Clear & Grub, Concrete-Flatwork/Paving/Minor/V-Ditch/Culvert, Demo, Drainage, Electrical, Grouted Stone/Gutter, Derrick Stone, Erosion Control, Epoxy Bonding, Fencing – Chain Link/Cable/Silt/Gates/Steel Pipe/Flap Gate, Hydro-seeding, Landscaper, Irrigation, MBGR, Painting & Coating, Pvmnt Mkrs, Pre-stressing Concrete, Metal Sheet Pile, Shoring & Bracing, Surveying, SWPPP, Utilities, Sound Wall/Retaining Wall, Vibration/Noise Monitoring, Structural Steel, Sound Wall, Aggregate Base, Decomposed Granite, Concrete & Cement, Misc Metal & Iron, Pipe – CMP/RCP, Rebar, Rip Rap, Tie Back/Down Anchors.                             

 

Published on August 19th, 2011 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME