Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: June 29th, 2010 through bid opening date

Ghilotti Construction

License# 644515

An Equal Opportunity Employer

Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:

Agency: County of Sonoma

County Project No.: C10001

Federal Aid No. ESPL-5920(121)

Project Name: 2010 ARRA Cost Savings Overlay Project

Project Description: Overlays of Leveroni Road (base bid), Bodega Hwy. (alternate), Mark West Springs Road (alternate) and Bennett Valley Road (alternate) in Santa Rosa, CA. Work consists of, in general, rubberized ac overlay of roadway, adjusting utility covers, adjusting guard rails, applying striping, installing delineators, repairing pavement structural section, cold planing, shoulder backing, asphalt dikes, parking bumpers, and other items as called for in specifications.

Engineer's Estimate: $1,500,000

35 WD and $2,500.00 per day LD

UDBE Goal: 12%

 

Submit quotes by 12:00pm on bid date

 

Bid Date: August 4th, 2010 at 2:00 PM

This request includes, but is not limited to, the following:WATER POLLUTION CONTROL PROGRAM, CAS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, ADJUST MANHOLE TO GRADE, COLD PLANE AC PAVEMENT, MICRO SEAL (TYPE II), PLACE AC DIKE (TYPE A), ADA RAMPS, MBGR, TERMINAL SYSTEM, STRIPING & PAVEMENT MARKINGS AND TRUCKING

: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be obtained through the County of Sonoma @ 2300 County Center Drive, Santa Rosa, CA , local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Mr. Jim Petnic is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance.

(Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractor will be required to sign a job agreement for trades covered under our agreements.)

 

Ghilotti Construction Company, Inc.

246 Ghilotti Ave

Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601

Contact: Annette Conley

annette@ghilotti.com

Published on June 29th, 2010 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME